Mendocino County Stormwater Trash Capture Devices

3 Documents in Project

Summary

SCH Number
2024030461
Lead Agency
Mendocino County
Document Title
Mendocino County Stormwater Trash Capture Devices
Document Type
NOD - Notice of Determination
Received
Posted
5/24/2024
Document Description
The proposed includes installation of both small-scale and large-scale trash capture devices and associated stormwater infrastructure at 35 project sites in Mendocino County. Small-scale devices would include structures such as connector pipe screens and hanging baskets installed at storm drain inlets. Large-scale devices would include structures such as hydrodynamic separators, netting devices, and baffle boxes. The devices would be installed in two phases: Phase 1 would occur at 30 sites planned for 2024, and Phase 2 would occur at five sites planned for 2025. Work at Phase 2 sites may result in alteration of a streambed or stream bank, may affect a jurisdictional water or wetland, or would require a more complex design. As such, most sites in Phase 2 would require regulatory permitting and approvals, whereas sites included in Phase 1 would not.

Contact Information

Name
Jason Wise
Agency Name
Mendocino County Department of Transportation
Job Title
Deputy Director of Transportation, Land Improvement
Contact Types
Lead/Public Agency / Project Applicant

Location

Counties
Mendocino
Regions
Countywide
Cross Streets
Various
Zip
95482
Parcel #
Various
State Highways
SR 20, SR 253, SR 222, US 101
Railways
Yes
Airports
Ukiah Municipal Airport
Schools
various
Waterways
Lake Mendocino

Notice of Determination

Approving Agency
Mendocino County
Approving Agency Role
Lead Agency
Approved On
County Clerk
Mendocino
Final Environmental Document Available at
340 Lake Mendocino Drive, Ukiah, CA 95482

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print