US-95 Pavement Rehabilitation
4 Documents in Project
Summary
SCH Number
2024030440
Lead Agency
California Department of Transportation, District 8
(DOT)
Document Title
US-95 Pavement Rehabilitation
Document Type
NOD - Notice of Determination
Received
Posted
6/24/2024
Document Description
The project proposes to restore, preserve, and extend the service life of the existing pavement on US-95 from post mile (PM) R57.207 to 64.5. The scope of work for this project consists of the overlay on the existing paved mainline and shoulders, mill at transition locations, repair distressed areas with localized digouts, replace asphalt concrete dikes, restripe traffic lanes, re-install rumble strips, place 4 feet wide shoulder backing, replace one sign panel, replace guardrails, and change portion of the existing centerline striping from passing to non-passing zones. All of the project is within the State's right of way, with the exception of the guardrail replacement near PM 64. At this location, the existing guardrail that is to be replaced is in Burlington Northern Santa Fe (BNSF) right of way.
Contact Information
Name
Gabrielle Duff
Agency Name
California Department of Transportation
Job Title
Senior Environmental Planner
Contact Types
Lead/Public Agency / Project Applicant
Phone
Location
Cities
N/A
Counties
San Bernardino
Regions
Southern California
Cross Streets
I-40/US-95 Separation
Notice of Determination
Approving Agency
Caltrans
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.