Hopyard Pipeline – Test Station Installation Project
Summary
SCH Number
2024030045
Public Agency
Zone 7 Water Agency
Document Title
Hopyard Pipeline – Test Station Installation Project
Document Type
NOE - Notice of Exemption
Received
Posted
3/1/2024
Document Description
The project will include five (5) individual small excavations, each approximately 6-feet by 8-feet, on Hopyard Road in Pleasanton. These test stations will allow Zone 7 to monitor corrosion over the pipeline to help determine when and where future repairs are needed. Work at each location will take approximately one week to complete. Traffic control will be provided during construction. Trench plating will be installed at the end of each work day. The completed excavation will be paved to match the existing street.
Contact Information
Name
Elke Rank
Agency Name
Zone 7 Water Agency
Job Title
Senior Water Resources Planner
Contact Types
Lead/Public Agency / Project Applicant
Phone
Email
Location
Cities
Pleasanton
Counties
Alameda
Regions
Citywide
Cross Streets
Hopyard Road between Owens Court and Parkside Drive
Zip
94566
Total Acres
<1
Jobs
1
State Highways
CA
Railways
UPRR, BART
Airports
Livermore Municipal
Schools
Hart, Harvest Park, Wells
Waterways
Alamo Canal, Arroyo Mocho
Township
3S
Range
1E
Section
00
Base
MDBM
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15301
Reasons for Exemption
15301. EXISTING FACILITIES. Operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of existing or former use.
None of the conditions noted under the California Environmental Quality Act (CEQA) Guidelines 15300.2 (as revised) will occur. Furthermore, this project will not result in potential for significant environmental impacts because:
• Work will be limited to the smallest footprint practicable.
• Work is within an existing road right-of-way
• No impacts to sensitive habitat or wildlife are expected.
• There is not a reasonable possibility that the project could result in a significant impact.
County Clerk
Alameda
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.