CEQA Determination for Pavement Rehabilitation for Various Streets (CDBG FY 23-24) Project No. 801 0110

Summary

SCH Number
2024021139
Public Agency
City of Moreno Valley
Document Title
CEQA Determination for Pavement Rehabilitation for Various Streets (CDBG FY 23-24) Project No. 801 0110
Document Type
NOE - Notice of Exemption
Received
Posted
2/28/2024
Document Description
The proposed pavement rehabilitation work includes the removal of the existing asphalt pavement surface and replacement of new asphalt pavement surface and/or crack sealing and slurry seal application depending on the existing conditions for 17 street segments and a new storm drain system within the Right of Ways of Brill Road and Day Street to prevent flooding. All work will take place In the existing City of Moreno Valley right-of-way.

Contact Information

Name
Claudia Manrique
Agency Name
City of Moreno Valley
Job Title
Associate Planner
Contact Types
Lead/Public Agency

Location

Cities
Moreno Valley
Counties
Riverside
Regions
Citywide
Other Information
Citywide

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Class 1, Section 15301, Class 3, Section 15303, and Class 4, Section 15304
Reasons for Exemption
Pursuant to CEQA, the project was reviewed and determined to be categorically exempt from CEQA pursuant to State Guidelines Sections 15301 for existing facilities, 15303 for construction of public facilities, and 15304 for minor alterations to land. This project involves pavement rehabilitation removal of existing asphalt pavement surface and replacement of new asphalt pavement surface and/or crack sealing and slurry seal application depending on the existing conditions for 17 street segments and a new storm drain system within the Right of Ways of Brill Road and Day Street to prevent flooding. These improvements are all consistent with the guidance for City capital projects provided in the City’s Rules and Procedures for the Implementation of CEQA for Class 1 exemptions (Section 5.1.2), which includes such items as minor operational improvements to drainage facilities, modification of existing features within the right of way to improve safety, and pavement reconstruction.

Exempt Status
Categorical Exemption
Type, Section or Code
Class 1, Section 15301, Class 3, Section 15303, and Class 4, Section 15304
Reasons for Exemption
Pursuant to CEQA, the project was reviewed and determined to be categorically exempt from CEQA pursuant to State Guidelines Sections 15301 for existing facilities, 15303 for construction of public facilities, and 15304 for minor alterations to land. This project involves pavement rehabilitation removal of existing asphalt pavement surface and replacement of new asphalt pavement surface and/or crack sealing and slurry seal application depending on the existing conditions for 17 street segments and a new storm drain system within the Right of Ways of Brill Road and Day Street to prevent flooding. These improvements are all consistent with the guidance for City capital projects provided in the City’s Rules and Procedures for the Implementation of CEQA for Class 1 exemptions (Section 5.1.2), which includes such items as minor operational improvements to drainage facilities, modification of existing features within the right of way to improve safety, and pavement reconstruction.

Exempt Status
Categorical Exemption
Type, Section or Code
Class 1, Section 15301, Class 3, Section 15303, and Class 4, Section 15304
Reasons for Exemption
Pursuant to CEQA, the project was reviewed and determined to be categorically exempt from CEQA pursuant to State Guidelines Sections 15301 for existing facilities, 15303 for construction of public facilities, and 15304 for minor alterations to land. This project involves pavement rehabilitation removal of existing asphalt pavement surface and replacement of new asphalt pavement surface and/or crack sealing and slurry seal application depending on the existing conditions for 17 street segments and a new storm drain system within the Right of Ways of Brill Road and Day Street to prevent flooding. These improvements are all consistent with the guidance for City capital projects provided in the City’s Rules and Procedures for the Implementation of CEQA for Class 1 exemptions (Section 5.1.2), which includes such items as minor operational improvements to drainage facilities, modification of existing features within the right of way to improve safety, and pavement reconstruction.

Exempt Status
Categorical Exemption
Type, Section or Code
Class 1, Section 15301, Class 3, Section 15303, and Class 4, Section 15304
Reasons for Exemption
Pursuant to CEQA, the project was reviewed and determined to be categorically exempt from CEQA pursuant to State Guidelines Sections 15301 for existing facilities, 15303 for construction of public facilities, and 15304 for minor alterations to land. This project involves pavement rehabilitation removal of existing asphalt pavement surface and replacement of new asphalt pavement surface and/or crack sealing and slurry seal application depending on the existing conditions for 17 street segments and a new storm drain system within the Right of Ways of Brill Road and Day Street to prevent flooding. These improvements are all consistent with the guidance for City capital projects provided in the City’s Rules and Procedures for the Implementation of CEQA for Class 1 exemptions (Section 5.1.2), which includes such items as minor operational improvements to drainage facilities, modification of existing features within the right of way to improve safety, and pavement reconstruction.
County Clerk
Riverside

Attachments

Notice of Exemption

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.