Bay Point and Saranap Full Trash Capture Installation

Summary

SCH Number
2024021119
Public Agency
Contra Costa County
Document Title
Bay Point and Saranap Full Trash Capture Installation
Document Type
NOE - Notice of Exemption
Received
Posted
2/28/2024
Document Description
The project will install subsurface trash capture devices certified by the State Water Resources Control Board at the two locations identified above. The County is a permittee of the Regional Water Quality Control Board’s Municipal Regional Stormwater Permit (MRP 3.0), which mandates attainment of a 100 percent trash load reduction to receiving waters by 2025. This project would help the County meet this mandate by treating areas with moderate or greater trash load rates within approximately 115 acres of Bay Point and 150 acres of Saranap, and preventing trash from reaching Suisun Bay, local tributaries, and Las Trampas Creek. Construction is anticipated to begin in 2024 and take approximately 50 working days to complete. Ground disturbance and excavation will occur to a maximum depth of approximately 14 feet. Applicable best management practices (BMPs) such as storm drain inlet protection will be implemented. No tree removal is anticipated but vegetation removal may be necessary. Traffic controls will be needed for the duration of construction at both locations. Utility relocations and real property transactions may be necessary.

Contact Information

Name
Shravan Sundaram
Agency Name
Contra Costa County Public Works Department
Job Title
Environmental Analyst
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project

Location

Counties
Contra Costa
Regions
Northern California, San Francisco Bay Area, Unincorporated
Cross Streets
Alves Lane and Willow Pass Road; Flora Avenue and Boulevard Way

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Article 19, Section 15302(c)
Reasons for Exemption
The project consists of reconstructing existing storm drain facilities with subsurface trash capture devices, involving negligible or no expansion of capacity, pursuant to Article 19, Section 15302(c) of the CEQA guidelines.
County Clerk
Contra Costa

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print