U.S. Highway 101 Corte Madera Creek Bridge Rehabilitation Project

3 Documents in Project

Summary

SCH Number
2024020937
Lead Agency
California Department of Transportation, District 4 (DOT)
Document Title
U.S. Highway 101 Corte Madera Creek Bridge Rehabilitation Project
Document Type
NOD - Notice of Determination
Received
Posted
5/3/2024
Document Description
The Project includes rehabilitation of the U.S. Highway 101 Corte Madera Creek Bridge deck and on-ramps, replacement of joint seal at Abutment D-16, drilling of vent holes in the Span 7 soffit, and protection of the rectangular bridge columns at D-7 through D-15 using a galvanic anode jacket system. The Project will require installation of temporary cofferdams and dewatering the area around the bridge columns. It will also require temporary closures, intermittent and short in duration, of the Corte Madera Pathway during two weeks of construction.

Contact Information

Name
Christopher Pincetich
Agency Name
Caltrans District 4
Job Title
Senior Planner
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Corte Madera, Larkspur
Counties
Marin
Regions
San Francisco Bay Area
Cross Streets
Sir Francis Drake Blvd / US HWY 101

Notice of Determination

Approving Agency
Caltrans District 4
Approving Agency Role
Lead Agency
Approved On
County Clerk
Marin
Final Environmental Document Available at
https://dot.ca.gov/caltrans-near-me/district-4/d4-popular-links/d4-environmental-docs

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.