PLER2022-00065 South Sacramento Sidewalk Gap Closure Project

2 Documents in Project

Summary

SCH Number
2024020627
Lead Agency
Sacramento County
Document Title
PLER2022-00065 South Sacramento Sidewalk Gap Closure Project
Document Type
NOD - Notice of Determination
Received
Posted
4/9/2024
Document Description
Within the project area, there are several portions of incomplete sidewalk along the public roadways and the proposed project will connect existing sidewalks, install drainage improvements, and install ADA ramps along with other minor improvements at existing intersections. Project activities will span approximately 1,650 feet in total, with sections on Cottonwood Avenue, Middlesax Way, Power Inn Road, Cottonwood Avenue, Sierra Sunset Drive, Stevenson Avenue, and Elsie Avenue within the community of South Sacramento. Where new sidewalk segments are installed, existing roadside ditches will be filled, and new drainage inlets and pipes will be installed to collect and direct storm runoff into the existing storm drainpipe in the roadway. To facilitate project activities, approximately 16 utility poles will be relocated. Excavation depths will range depending on the nature of the proposed work. The pavement, curb, sidewalk, and driveway excavation depth will not exceed 12”. Work to modify drainage pipes, inlets, and manholes will vary from 5-8 feet in depth. Sidewalk and intersection improvements include: • Power Inn Road and Stevenson Avenue: A sidewalk connection will be made from 8101 Lemon Cove to 8141 Stevenson Avenue. This will include curb ramps for two entry points of the property at 8112 Stevenson Avenue and ADA curb ramps at all four corners at the intersection of Power Inn Road and Stevenson Road. • Power Inn Road and Elsie Avenue: A sidewalk connection will be made along the western boundary of APN 115-0073-001-0000 to an existing intersection crossing and ADA ramp. • Elsie Avenue: A sidewalk connection will be made from 7901 Elsie Avenue to 8011 Elsie Avenue. The connection consists of curb ramps for two entry points to the properties at 7917 Elsie Avenue and one entry point to the property at 8001 Elsie Avenue. • Stevenson Avenue and Cottonwood Lane: A sidewalk connection will be made from 8431 Stevenson Avenue to Cottonwood Lane. This will include curb ramps for two entry points to the property at 8431 Stevenson Avenue, and ADA curb ramps at all four corners of the Cottonwood Lane and Stevenson Avenue intersection. A sidewalk connection will be made at the intersection of Stevenson Avenue and Elegante Way and curb ramps will be used as the entry point of the property at 8440 Stevenson Avenue. • Cottonwood Avenue and Middlesax Way: The sidewalk connection around 8431 Stevenson Avenue will continue past the Stevenson Avenue and Cottonwood Avenue intersection with ADA curbs added to all four corners of the intersection. An additional curb ramp will be added to 8431 Stevenson Ave for the east-facing property located on the parcel. • Cottonwood Avenue and Sierra Sunset Drive: A sidewalk connection will be made from 7923 Cottonwood Avenue to 7859 Cottonwood Avenue. This will include curb ramps for entry points to the properties at 7921 Cottonwood Avenue, 7901 Cottonwood Avenue, 7865 Cottonwood Avenue, and 7859 Cottonwood Avenue. This will also include ADA curb ramps at the western side of the Cottonwood Avenue and Sierra Sunset Drive intersection. Project activities are scheduled from April 2024 to 2026. During daytime construction, at least one lane of traffic in each direction will be maintained. Temporary roadway or lane closures may occur at night for slurry sealing and re-striping.

Contact Information

Name
Julie Newton
Agency Name
Sacramento County Planning
Job Title
ENVIRONMENTAL COORDINATOR
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Regions
Countywide
Parcel #
N/A

Notice of Determination

Approving Agency
Sacramento County Planning
Approving Agency Role
Lead Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
https://planningdocuments.saccounty.net/

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.