Rancho 30 Cultivation Facility (CUP 23-11 and LDP 23-27)

2 Documents in Project

Summary

SCH Number
2024010988
Lead Agency
City of Adelanto
Document Title
Rancho 30 Cultivation Facility (CUP 23-11 and LDP 23-27)
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Manufacturing/Industrial (MI)
Document Description
The proposed project would involve 4 total phases. Phase 1 consists of the construction of three new buildings totaling 86,649 square feet within the 9.48-acre property located on the southwest corner of Rancho Road and Raccoon Avenue. The three new buildings are referred to as Building A, Building B, and Building C. Building A would be a single level cultivation building and would consist of 34,425 square feet; Building B would be a single level cultivation building and would consist of 34,425 square feet; and Building C would be a two level building and would consist of 17,799 square feet. The total floor area of the three new buildings would be 86,649 square feet. Access to the proposed development would be provided by three new driveway connections. One connection would be with the south side of Rancho Avenue and two driveway connections would be with the west side of Raccoon Road. The southernmost connection on Raccoon Avenue would be for emergency access only. A total of 112 parking spaces would be provided. A proposed bioswale would be located on the site’s northeast corner. Landscaping would total 48,381 square feet and would be installed throughout the site and along the site’s frontages with Rancho Road and Raccoon Avenue. Phase 2 of the project would consist of 5 new buildings totaling 138,110 square feet within the 10.28-acre property located west of Phase 1’s buildings. The APN for this property is 3128-011-03. The 5 buildings are referred to as Buildings F, I, L, O, and P. Buildings F, I, and L would be a single level building and would consist of 34,425 square feet of floor area and would be used for cultivation. Building O would be used for processing would consist of 10,160 square feet; Building P would be a single level processing building and would consist of 24,675 square feet of floor area. A 33,207 square foot retention basin would be constructed in the northeast corner of the Phase 2 area. Access would be provided by an internal drive aisles that would ultimately connect to Rancho Road or Raccoon Avenue. Construction of Phase 2 would commence in the 2nd quarter of 2027. Phase 3 of the project would consist of 4 new buildings totaling 123,675 square feet within the 11.09-acre property located west of Phase 2 development. The APN for this property is 3128-011-02. These 4 buildings are referred to as Building E, H, K, and N. Buildings E, H, and K would be a single level building and each building would consist of 34,425 square feet of floor area and would be used for cultivation. Building N would consist of a single level, would be used for processing, and would total 20,400 square feet of floor area. Access would be provided by an internal drive aisles that would ultimately connect to Rancho Road or Raccoon Avenue. Construction of Phase 3 would commence in the 1st quarter of 2029. Phase 4 of the project would consist of 4 new buildings totaling 131,325 square feet of floor area within the parcel that is shared with Phase 3. The APN for Phase 4 is 3128-011-02. These 4 buildings are referred to as Building D, G, J, and M. Buildings D, G, and J would be a single level building and each building would consist of 34,425 square feet of floor area and would be used for cultivation. Building M would be a single level processing building and would consist of 28,050 square feet of floor area. Access would be provided by an internal drive aisles that would ultimately connect to Rancho Road or Raccoon Avenue. Construction of Phase 4 would commence in the 1st quarter of 2031.

Contact Information

Name
James Hirsch
Agency Name
City of Adelanto
Job Title
Senior Contract Planner
Contact Types
Lead/Public Agency

Name
Marc Blodgett
Agency Name
Blodgett Baylosis Environmental Planning
Job Title
Project Principal
Contact Types
Consulting Firm

Name
Jim Tracy
Agency Name
Park West Companies
Job Title
CEO
Contact Types
Project Applicant

Location

Cities
Adelanto
Counties
San Bernardino
Regions
Citywide, Southern California
Cross Streets
Rancho Road & Raccoon Avenue
Zip
92301
Total Acres
30.85
Jobs
310
Parcel #
3128-011-02, 3128-011-03, & 3128-011-04
Schools
Adelanto High School
Township
5N
Range
5W
Section
06

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Cannabis Control (DCC), California Department of Corrections and Rehabilitation (CDCR), California Department of Fish and Wildlife, Cannabis Program (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Pesticide Regulation (DPR), California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 8 (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), Department of Food and Agriculture (CDFA), Office of Historic Preservation, State Water Resources Control Board, Division of Water Rights, California Department of Fish and Wildlife, Inland Deserts Region 6 (CDFW)
State Reviewing Agency Comments
California Department of Fish and Wildlife, Inland Deserts Region 6 (CDFW)
Development Types
Industrial (Sq. Ft. 479325, Acres 30.85, Employees 310)
Local Actions
Site Plan, Use Permit, Land Division (Subdivision, etc.)
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Public Review Period Start
Public Review Period End

Attachments

State Comment Letters [Comments from State Reviewing Agency(ies)]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.