Haynes Generating Station Recycled Water Pipeline Project
3 Documents in Project
Summary
SCH Number
2024010488
Lead Agency
City of Long Beach
Document Title
Haynes Generating Station Recycled Water Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
4/22/2024
Document Description
The Project consists of constructing a contiguous recycled water (RW) pipeline to serve Los Angeles Department of Water & Power’s Haynes Generating Station located in the City of Long Beach. The Project would be constructed within previously disturbed areas supporting numerous existing structures and subsurface utilities, City and State roadways, and associated surface improvements (i.e., paving, landscaping, and above-ground utilities). The RW pipeline would be constructed primarily within existing local roadway right-of-way. Additional construction would occur within Caltrans public right-of-way. The majority of the RW pipeline would be installed via the traditional method of open-cut trenching. A small section of the Project would be placed within a micro-tunnel steel casing that would be constructed under State Route 22.
Contact Information
Name
Dennis Santos
Agency Name
Long Beach Utilities Department
Job Title
Manager of Engineering
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Long Beach, Seal Beach
Counties
Los Angeles, Orange
Regions
Citywide
Cross Streets
Along Studebaker Rd, crossing Atherton St, Anaheim Rd, College Park Dr, State Route 22
Zip
90807
Total Acres
N/A
Parcel #
095-681-19
State Highways
SR 1, SR 22, I-405, I-605
Airports
Los Alamitos Joint Forces Base
Schools
Emerson Parkside Acad, St. Joseph Elem, William F Prisk Elem
Waterways
San Gabriel River
Township
4S
Range
12W
Section
35
Base
SBM
Notice of Determination
Approving Agency
Long Beach Utilities Department
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
https://www.longbeach.gov/lbcd/planning/environmental/reports/
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.