Garstin Water Operations Facility Replacement Project

2 Documents in Project

Summary

SCH Number
2024010440
Lead Agency
City of Big Bear Lake
Document Title
Garstin Water Operations Facility Replacement Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Public Facility
Document Description
The City of Big Bear Lake, Department of Water and Power (BBLDWP) proposes implementation of the Garstin Water Operations Facility Project (Project) to build a stronger and more resilient community through the construction of public water operation facilities and the promotion of energy efficiency. The Project includes design and construction of an approximate 13,600 square foot, concrete block, single story operations building with solar panels; a 10,000 square foot, metal, single story warehouse/warm storage building, and a 7,200 square foot, concrete block, single story, covered parking structure with solar panels, liquid chlorine storage, battery backup, generator backup and electrical equipment room; and a reconfiguration of the parking lots to accommodate the new buildings. Implementation of the Project is anticipated to occur in two phases as follows, but may be constructed in one single phase: Phase I – Design and construction of a new 13,600 square foot, concrete block, single story operations building; a new 10,000 square foot, warehouse / warm storage building and northerly site improvements to reconfigure the parking lots. Design of a new 7,200 square foot, concrete block, single story, covered parking structure with solar panels, liquid chlorine storage, battery backup, generator backup and electrical equipment room; and Phase II – Demolition of the existing operations building and construction of the 7,200 square foot, concrete block, single story, covered parking structure with solar panels, liquid chlorine storage, battery backup, generator backup and electrical equipment room. The Operations Building and the covered parking area, will be designed to have solar panels to minimize (offset) overall energy demand for the new complex. In addition to the main buildings, the project includes additional and reconfigured parking and material storage areas and a possible greenhouse facility and adjacent demonstration garden.

Contact Information

Name
Reginald A. Lamson
Agency Name
City of Big Bear Lake Department of Water and Power
Job Title
General Manager
Contact Types
Lead/Public Agency

Location

Cities
Big Bear Lake
Counties
San Bernardino
Regions
Southern California
Cross Streets
facility located at 41972 Garstin Drive in the City of Big Bear Lake
Zip
92315
Total Acres
1.47
Parcel #
N/A
State Highways
18
Railways
N/A
Airports
Big Bear Airport
Schools
N/A
Waterways
Big Bear Lake
Township
2N
Range
1E
Section
21
Base
SBBM

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, Inland Deserts Region 6 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Transportation, District 8 (DOT), California Department of Transportation, Division of Aeronautics (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Energy Commission, California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), California State Lands Commission (SLC), Office of Historic Preservation, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Other (Water Facilities: Headquarter)
Local Actions
Site Plan, Water Facility
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire

Attachments

Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print