Belridge Pipeline Project

2 Documents in Project

Summary

SCH Number
2024010439
Lead Agency
Buena Vista Water Storage District
Document Title
Belridge Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
3/21/2024
Document Description
The District is proposing to construct the approximately 2-mile Belridge Pipeline between the California Aqueduct and the District’s 7th Standard Pipeline. The west end of the Belridge Pipeline would connect to an existing California Department of Water Resources turnout at the California Aqueduct. The pipeline would extend east from the California Aqueduct, across undeveloped land owned by the Chevron Corporation and other private parties, as well as across a portion of the Lokern Preserve before tying into the existing 7th Standard Pipeline just west of the Kern River Flood Canal. In addition to facilitating delivery to District water users, the Belridge Pipeline would also deliver water to the proposed Corn Camp Groundwater Recharge Pond, via an existing approximately 2-mile segment of the 7th Standard Pipeline. Additionally, the proposed project would install a new fiber optic line and new electrical line along the east side of the California Aqueduct to service the turnout at the California Aqueduct.

Contact Information

Name
Tim Ashlock
Agency Name
Buena Vista Water Storage District
Job Title
Engineering Manager
Contact Types
Lead/Public Agency

Location

Cities
unincorporated area
Counties
Kern
Regions
Unincorporated
Cross Streets
Main Drain Road and Dargatz Road
Zip
93206
Total Acres
22.59
Parcel #
099-010-01
State Highways
N/A
Railways
N/A
Airports
N/A
Schools
N/A
Waterways
CA Aqueduct, Kern River Flood Canal
Township
28S
Range
22E
Section
2
Base
Lokern

Notice of Determination

Approving Agency
Buena Vista Water Storage District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Kern
Final Environmental Document Available at
https://bvh2o.com/Projects.html

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print