Belridge Pipeline Project

2 Documents in Project

Summary

SCH Number
2024010439
Lead Agency
Buena Vista Water Storage District
Document Title
Belridge Pipeline Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Agriculture
Document Description
The District is proposing to construct the approximately 2-mile Belridge Pipeline between the California Aqueduct and the District's 7th Standard Pipeline. The west end of the Belridge Pipeline would connect to an existing California Department of Water Resources turnout at the California Aqueduct. The pipeline would extend east from the California Aqueduct, across undeveloped land owned by the Chevron Corporation and other private parties, as well as across a portion of the Lokern Preserve before tying into the existing 7th Standard Pipeline just west of the Kern River Flood Canal. In addition to facilitating delivery to District water users, the Belridge Pipeline would also deliver water to the existing Corn Camp Groundwater Recharge Pond, via an existing approximately 2-mile segment of the 7th Standard Pipeline. Additionally, the proposed project would install a new fiber optic line and new electrical line along the east side of the California Aqueduct to service the turnout at the California Aqueduct.

Contact Information

Name
Tim Ashlock
Agency Name
Buena Vista Water Storage District
Job Title
Manager
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
unincorporated area
Counties
Kern
Regions
Unincorporated
Cross Streets
Main Drain Road and Dargatz Road
Zip
93206
Total Acres
22.59
Parcel #
099-010-01
State Highways
N/A
Railways
N/A
Airports
N/A
Schools
N/A
Waterways
CA Aqueduct, Kern River Flood Canal
Township
28S
Range
22E
Section
2,3,4
Base
Lokern
Other Location Info
The project would be constructed in Sections 2, 3, 4, 9,10, and 11 of Township 29 South, Range 22 East, and Section 32 of Township 28 South, Range 22 East, all within the Mount Diablo Base and Meridian.
Other Information
N/A

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Parks and Recreation, California Department of Transportation, District 6 (DOT), California Department of Water Resources (DWR), California Energy Commission, California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Valley Fresno Region 5 (RWQCB), Central Valley Flood Protection Board, Office of Historic Preservation, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance, California Department of Fish and Wildlife, Central Region 4 (CDFW)
State Reviewing Agency Comments
California Department of Fish and Wildlife, Central Region 4 (CDFW)
Development Types
Other (construction of 2.5 miles of pipeline)
Local Actions
Construction of pipeline
Project Issues
Air Quality, Biological Resources, Cultural Resources, Geology/Soils, Greenhouse Gas Emissions
Public Review Period Start
Public Review Period End

Attachments

Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from state reviewing agencies]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print