Tonyville Water Distribution System Rehabilitation and Reliability Project

3 Documents in Project

Summary

SCH Number
2024010352
Lead Agency
Lindsay Strathmore Irrigation District
Document Title
Tonyville Water Distribution System Rehabilitation and Reliability Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Agricultural, rural residential and general commercial/mixed use
Document Description
Proposed Project consists of replacing existing old water pipelines and eliminating dead ends. Most proposed Project features (pipelines, valves, water services and connections) will be located underground. Existing fire hydrants will be replaced. The pipeline will be located in the public right-of-way. The total length of pipeline to be replaced is about 4,400 lineal feet. Construction activities include excavation, pipe installation, backfill and surface restoration. The Proposed Project includes an additional 1,300 feet of new water pipeline that will be used to interconnect the dead ends. The Proposed Project also includes the installation of a new standby engine generator at the District's water treatment plant. The Project also includes reconnection of existing fire hydrants. The pipeline will be located in the public right-of-way and executed easements. Construction activities include excavation, pipe installation, backfill and surface restoration.

Contact Information

Name
Dennis R. Keller
Agency Name
Lindsay Strathmore Irrigation District
Job Title
District Consulting Engineer
Contact Types
Consulting Firm

Location

Cities
Unincorporated community of Tonyville
Counties
Tulare
Regions
Unincorporated
Cross Streets
Avenue 216 and Road 252
Zip
93247
Total Acres
3
Parcel #
142-140-044,142-150-024, Public R.O.W.
State Highways
65
Railways
San Joaquin Valley Railroad
Airports
None
Schools
None
Waterways
Lewis Creek
Township
19S
Range
21E
Section
30
Base
MDB&M
Other Location Info
Tonyville Surface Water Treatment Plant

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, Central Region 4 (CDFW), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 6 (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Valley Fresno Region 5 (RWQCB), Central Valley Flood Protection Board, Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Drinking Water, District 12, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Other (Water Pipelines (5,700 l.f.))
Local Actions
Water Pipelines (5,700 l.f.)
Project Issues
Biological Resources
Local Review Period Start
Local Review Period End

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print