Marina to Castroville CAPM

3 Documents in Project

Summary

SCH Number
2024010344
Lead Agency
California Department of Transportation, District 5 (DOT)
Document Title
Marina to Castroville CAPM
Document Type
NOD - Notice of Determination
Received
Posted
6/26/2024
Document Description
The California Department of Transportation (Caltrans) proposes to preserve 22.2 lane miles of Class 2 pavement, pave beyond gore areas, rehabilitate one drainage system, replace traffic management system elements, rehabilitate lighting, build bicycle and pedestrian infrastructure, and upgrade guardrails to the Manual for Assessing Safety Hardware (MASH) standards. The project is located on State Route 1 in Monterey County, from 0.28 mile south of the South Marina Overhead (44-211L) to the State Route 1/156 junction. The project area is an approximately 5.88-mile section of State Route 1. At this location, State Route 1 is a four- to six-lane access-controlled freeway consisting of 12-foot-wide travel lanes with paved shoulders that vary from 5 to 10 feet wide.

Contact Information

Name
Dianna Beck
Agency Name
Caltrans District 5
Job Title
Senior Environmental Scientist
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Marina
Counties
Monterey
Regions
Citywide, Countywide, Statewide
Cross Streets
Reservation Rd.
Zip
93933
State Highways
State Route 1
Railways
Union Pacific Railroad
Airports
Marina Municipal Airport
Schools
California State University at Monterey Bay

Notice of Determination

Approving Agency
Caltrans District 5
Approving Agency Role
Lead Agency
Approved On
County Clerk
Monterey
Final Environmental Document Available at
https://dot.ca.gov/caltrans-near-me/district-5/district-5-current-projects/05-1n160

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print