1499 Old Bayshore Highway

2 Documents in Project

Summary

SCH Number
2024010163
Lead Agency
City of Burlingame
Document Title
1499 Old Bayshore Highway
Document Type
NOD - Notice of Determination
Received
Posted
4/12/2024
Document Description
The Project would demolish two buildings, merge two parcels, and construct an office/research-and-development (R&D) building with parking on the Project site. The office/R&D building would be sited at the front of the Project site, along Old Bayshore Highway and rise eight stories tall with an area of 314,921 gross square feet (gsf). Parking would be provided along Mahler Road, in a standalone, seven-story, 208,423-gsf aboveground parking garage with 639 parking spaces and 72 bicycle parking spaces. Project development would include 5,642 gsf of ground-floor lobby and tenant amenity space, including a cafe, and provide a 6,900-gsf public plaza/open space courtyard. To address flooding issues, the Project would raise the site's base elevation to 13 feet above sea level and install a permanent sea wall at 15.5 feet above seal level along Mills Creek, which would provide a 1.5-foot wall from the open space courtyard. The Project is proposed as a Tier 3 project, and at this location within the City may reach a maximum FAR of 2.75 and may exceed a maximum height of 65-feet with approval of a Special Permit by the Burlingame Planning Commission. Project operation is expected to generate 756 employees between the office, R&D, and cafe uses.

Contact Information

Name
Catherine Keylon
Agency Name
City of Burlingame Planning Division
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Location

Cities
Burlingame
Counties
San Mateo
Regions
San Francisco Bay Area
Cross Streets
Old Bayshore Highway and Mahler Road
Zip
94010
Total Acres
2.87
Jobs
756
Parcel #
026-322-150 and 026-322-050
State Highways
US 82, US 101, SR 280
Railways
Caltrain, BART
Airports
SFO
Schools
Mills HS, Avalon Academy, Burlingame Music School
Waterways
SF Bay, Mills Creek, San Andreas Lake

Notice of Determination

Approving Agency
City of Burlingame
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Mateo
Final Environmental Document Available at
501 Primrose Road, Burlingame, CA, 94010

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print