1499 Old Bayshore Highway

2 Documents in Project

Summary

SCH Number
2024010163
Lead Agency
City of Burlingame
Document Title
1499 Old Bayshore Highway
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Innovation-Industrial (I-I)
Document Description
The Project would demolish two buildings, merge two parcels, and construct an office/research-and-development (R&D) building with parking on the Project site. The office/R&D building would be sited at the front of the Project site, along Old Bayshore Highway and rise eight stories tall with an area of 314,921 gross square feet (gsf). Parking would be provided along Mahler Road, in a standalone, seven-story, 208,423-gsf aboveground parking garage with 639 parking spaces and 72 bicycle parking spaces. Project development would include 5,642 gsf of ground-floor lobby and tenant amenity space, including a cafe, and provide a 6,900-gsf public plaza/open space courtyard. To address flooding issues, the Project would raise the site's base elevation to 13 feet above sea level and install a permanent sea wall at 15.5 feet above seal level along Mills Creek, which would provide a 1.5-foot wall from the open space courtyard. The Project is proposed as a Tier 3 project, and at this location within the City may reach a maximum FAR of 2.75 and may exceed a maximum height of 65-feet with approval of a Special Permit by the Burlingame Planning Commission. Project operation is expected to generate 756 employees between the office, R&D, and cafe uses.

Contact Information

Name
Catherine Keylon
Agency Name
City of Burlingame Planning Division
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Name
Jennifer Ostner
Agency Name
ICF
Job Title
Senior Environmental Planner
Contact Types
Consulting Firm

Location

Cities
Burlingame
Counties
San Mateo
Regions
San Francisco Bay Area
Cross Streets
Old Bayshore Highway and Mahler Road
Zip
94010
Total Acres
2.87
Jobs
756
Parcel #
026-322-150 and 026-322-050
State Highways
US 82, US 101, SR 280
Railways
Caltrain, BART
Airports
SFO
Schools
Mills HS, Avalon Academy, Burlingame Music School
Waterways
SF Bay, Mills Creek, San Andreas Lake

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Fish and Wildlife, Marin Region 7 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Resources Recycling and Recovery, California Department of Toxic Substances Control (DTSC), California Department of Transportation, Division of Aeronautics (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), California State Lands Commission (SLC), Office of Historic Preservation, San Francisco Bay Conservation and Development Commission (BCDC), State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Quality, California Department of Transportation, District 4 (DOT)
State Reviewing Agency Comments
California Department of Transportation, District 4 (DOT)
Development Types
Office (Sq. Ft. 314921, Acres 2.87, Employees 756)
Local Actions
Use Permit
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Population/Housing, Public Services, Recreation, Sewer Capacity, Solid Waste, Transportation, Wildfire
Local Review Period Start
Local Review Period End

Attachments

Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from state reviewing agencies]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print