Minor Alteration No. WA2025045 – Willow Slough Bridge Replacement Project—Drainage Pipe Revetment
7 Documents in Project
Summary
SCH Number
2024010128
Lead Agency
California Department of Transportation, District 3
(DOT)
Document Title
Minor Alteration No. WA2025045 – Willow Slough Bridge Replacement Project—Drainage Pipe Revetment
Document Type
NOD - Notice of Determination
Received
Posted
5/2/2025
Document Description
Approval of Minor Alteration No. WA2025045, under the California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: Installation of drainage pipe revetment as part of the Willow Slough Bridge Replacement Project.
Contact Information
Name
Angela Nguyen-Tan
Agency Name
Central Valley Flood Protection Board
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency
Phone
Name
Veronica Wilson
Agency Name
California Department of Transportation
Job Title
Senior Land Planner
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project
Phone
Location
Coordinates
Cities
Elk Grove
Counties
Sacramento
Regions
Northern California
Waterways
Willow Slough
Township
6N
Range
6E
Section
33
Base
MDB&M
Other Location Info
The project is located where the existing State Route 99 crosses Willow Slough within the Consumnes River Designated Floodway, approximately 5.5 miles south of the City of Elk Grove in Sacramento County.
Notice of Determination
Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
California Department of Transportation, 703 B St. Marysville, CA 95901
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.