Intel Central Utility Building Project

2 Documents in Project

Summary

SCH Number
2024010085
Lead Agency
City of Santa Clara
Document Title
Intel Central Utility Building Project
Document Type
NOD - Notice of Determination
Received
Posted
4/19/2024
Document Description
The project proposes to redevelop the approximately 1.3-acre project site (3065 Bowers Avenue, City of Santa Clara,) with a 17,000-square foot Central Utility Building (CUB). The CUB structure would have a ground-level footprint of approximately 14,200 square feet with an additional 2,800 square feet of mechanical penthouse at the roof level. The CUB would have a height of 50 feet, which includes a 20-foot parapet to screen rooftop equipment. The CUB would house a chiller area, pumps, brine containment, generator yard, electrical substation/battery storage room, mechanical equipment, and natural gas boilers. The CUB would also include a 175-square-foot office area to be utilized by engineering and maintenance staff.

Contact Information

Name
Steve Le
Agency Name
City of Santa Clara
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Location

Cities
Santa Clara
Counties
Santa Clara
Regions
Citywide
Cross Streets
3065 Bowers Avenue, City of Santa Clara
Zip
95050
Total Acres
1.3

Notice of Determination

Approving Agency
City of Santa Clara
Approving Agency Role
Lead Agency
Approved On
County Clerk
Santa Clara
Final Environmental Document Available at
www.santaclaraca.gov/CEQA

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.