Alturas CAPM project

3 Documents in Project

Summary

SCH Number
2023120526
Lead Agency
California Department of Transportation, District 2 (DOT)
Document Title
Alturas CAPM project
Document Type
NOD - Notice of Determination
Received
Posted
4/16/2024
Document Description
Caltrans proposes to rehabilitate the pavement on State Route (SR) 299 from Post Miles (PMs) 40.40 to 40.63 and on U.S. 395 from Post Miles R17.50 to 34.00 and conduct drainage facility work at 13 locations. Most of this project is located along U.S. 395, a north-south route, which is a principal arterial at this location. U.S. 395 is part of the National Highway System (NHS), the Interregional Road System (IRRS), and a Terminal Access Route. It is also part of the Blue Star Memorial Highway, the Three Flags Highway, and the Emigrant Trail Scenic Byway. U.S. 395 also acts as the main street through the city of Alturas. A small portion of the project (0.23 mile) is located on SR 299 within the city of Alturas. SR 299 is also a principal arterial, part of the NHS, the IRRS, and a Terminal Access Route. The city of Alturas is located at Section 12, Township 42 North, Range 12 East. With the implementation of Caltrans Standard Measures and Best Management Practices, the project would have a less than significant impact on the environment.

Contact Information

Name
Michael Crook
Agency Name
CA Department of Transportation
Job Title
Environmental Scientist (Project Coordinator)
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project

Location

Cities
Alturas
Counties
Modoc
Regions
Countywide
Zip
96101
Other Information
S.R. 299 & U.S. 395 pavement rehabilitation in Modoc County

Notice of Determination

Approving Agency
California Department of Transportation
Approving Agency Role
Lead Agency
Approved On
County Clerk
Modoc
Final Environmental Document Available at
1031 Butte Street, MS-30 Redding, California 96001

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print