Lateral QQc Regulation Basin Project

2 Documents in Project

Summary

SCH Number
2023120468
Lead Agency
South San Joaquin Irrigation District
Document Title
Lateral QQc Regulation Basin Project
Document Type
NOD - Notice of Determination
Received
Posted
2/16/2024
Document Description
The Project proposes to construct a regulating basin, a concrete flow control structure for Lateral Q, and a basin inlet pipe from Lateral Qc connected to a combined gravity and pumped concrete outlet structure and connection box. Project construction components are described in detail below: • The proposed regulating basin would be approximately 18.8 acres with an operational volume of 52-acre feet. The basin would either be lined with high density polyethylene (HDPE) or clay. There would also be a three (3)-foot canal liner raise for Lateral Q upstream of the proposed basin for +/- 1,100 linear feet to the existing check structure. • The Lateral Q concrete outlet flow control structure would be capable of passing 150 cubic feet per second (CFS) maximum. It would include three (3) Rubicon SMB 1050-3000-C Slip Meters. • The Lateral Qc combined gravity and pumped concrete outlet structure and connection box would be capable of passing 25 CFS. It would consist of an approximately 42-inch Rubber-Gasketed Reinforced Concrete Pipe (RGRCP), one (1) Rubicon SMB 1050-2400-C Slip Meter, and would include pump, 24-inch PVC pipe, and miscellaneous fittings, meters, appurtenances, etc. All excavation material would be balanced on-site. No spoils would be exported from the Project site. In order to power the pump, gate actuators and control systems for the SCADA, a new power connection would be required. The nearest power line follows the east side of Murphy Road, and a potential drop is near the existing control box just north of Ripon Fire Station 52.

Contact Information

Name
Forrest Killingsworth
Agency Name
South San Joaquin Irrigation District
Job Title
Engineering Department Manager
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Manteca, Ripon
Counties
San Joaquin
Regions
Northern California
Parcel #
245-060-250 and 245-060-430
Other Location Info
The Project is located in San Joaquin County, approximately 4.3 miles east of Manteca and 2.3 miles northeast of Ripon. The Project site is located on Assessor’s Parcel Numbers 245-060-250 and 245-060-430. The centroid of the Project site is 37° 47’ 22.77” N, 121° 06’ 14.20” W. The area of potential effect (APE) is approximately 23 acres.

Notice of Determination

Approving Agency
South San Joaquin Irrigation District
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Joaquin
Final Environmental Document Available at
South San Joaquin Irrigation District, 11011 E. Highway 120, Manteca, CA 95336

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print