San Joaquin Field Division O&M Center Drainage Culvert Replacement Project

2 Documents in Project

Summary

SCH Number
2023120438
Lead Agency
California Department of Water Resources (DWR)
Document Title
San Joaquin Field Division O&M Center Drainage Culvert Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
2/14/2024
Document Description
The proposed Project would replace the existing drainage culvert to improve drainage. Project elements include replacement of the existing arch corrugated metal pipe culvert with a new concrete box culvert, improvements to the upstream and downstream flow channels, and improvements to the connection to an existing drainage swale. The Project also includes the temporary use of a 10,000 square-foot staging area during construction.

Contact Information

Name
Gerald Snow
Agency Name
Department of Water Resources
Job Title
Environmental Program Manager II
Contact Types
Lead/Public Agency / Parties Undertaking Project

Location

Counties
Kern
Regions
Southern California, Unincorporated
Other Location Info
San Joaquin Field Division, S. Sabodan Street, Bakersfield, CA

Notice of Determination

Approving Agency
Department of Water Resources
Approving Agency Role
Lead Agency
Approved On
County Clerk
Kern
Final Environmental Document Available at
https://water.ca.gov/News/Public-Notices/2023/Dec-23/Notice-of-San-Joaquin-Field-Division-Culvert-Replacement-Mitigated-Negative-Declaration

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print