Smith Reservoir Replacement Project

2 Documents in Project

Summary

SCH Number
2023120317
Lead Agency
Serrano Water District
Document Title
Smith Reservoir Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
5/6/2024
Document Description
The Project consists of replacing the existing 6-million-gallon (MG) Smith Reservoir and Pump Station which has reached the end of its useful life. The replacement reservoir will include: two below grade cast-in-place concrete tanks of the same size as the existing below grade tanks; a replacement pump station with increased maximum pumping capacity from 7,400 gallons per minute (gpm) to 8,400 gpm and with modernized with instrumentation and controls as well as improvements to facilitate maintenance; and construction of a valve vault and connection into existing City of Orange system in Cannon Street, at intersection of Taft Avenue and Cannon Street. Construction will occur in two phases: Phase 1 involves the East Tank and pump station; Phase 2 involves the West Tank. The Project will provide storage capacity to meet operational, fire, and emergency water demands for the District.

Contact Information

Name
Jerry Vilander
Agency Name
Serrano Water District
Job Title
General Manager
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Villa Park
Counties
Orange
Regions
Citywide
Cross Streets
Taft Avenue and Sycamore Street
Zip
92861
Total Acres
1.7-acres
Parcel #
372-192-12, 372-192-13, 372-192-14
State Highways
SR 55
Schools
Linda Vista Elementary School
Waterways
Santiago Creek

Notice of Determination

Approving Agency
Serrano Water District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Orange
Final Environmental Document Available at
https://serranowater.org/

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print