Santa Cruz Route 1 CAPM Project

3 Documents in Project

Summary

SCH Number
2023110633
Lead Agency
California Department of Transportation, District 5 (DOT)
Document Title
Santa Cruz Route 1 CAPM Project
Document Type
NOD - Notice of Determination
Received
Posted
4/9/2024
Document Description
Caltrans proposes to rehabilitate 8.3 lane miles of flexible Class 2 pavement using Capital Preventative Maintenance (CAPM) strategies. These strategies include, but are not limited to, digouts (repair of more distressed areas of pavement through partial depth replacement), profile grinding, cold planing 0.15 foot of pavement, and placing 0.15 foot of Rubberized Hot Mix Asphalt overlay. The project will also include upgrading or replacing 91 curb ramps, repairing sidewalks, replacing or upgrading guardrails, upgrading sign panels and posts, replacing 0.10 lane mile of Class 2 bike lanes, enhancing the visibility of crosswalks, delineating bike boxes, enhancing pedestrian islands, and adding two bus stop platforms in coordination with the City of Santa Cruz and the Santa Cruz County Regional Transportation Commission. The project will occur between post miles 17.50 and 20.20 on State Route 1.

Contact Information

Name
Lara Bertaina
Agency Name
Caltrans
Job Title
Senior Environmental Scientist, Branch Manager
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project

Location

Cities
Santa Cruz
Counties
Santa Cruz
Regions
Citywide
Cross Streets
Numerous
State Highways
1, 9, 17
Railways
Santa Cruz Railroad
Schools
Numerous
Waterways
Pacific Ocean, San Lorenzo River, Moore Creek, Carbonera Creek, Branciforte Creek

Notice of Determination

Approving Agency
Caltrans
Approving Agency Role
Lead Agency
Approved On
County Clerk
Santa Cruz
Final Environmental Document Available at
https://dot.ca.gov/caltrans-near-me/district-5/district-5-current-projects

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print