Lift Station No. 4 Replacement Project

2 Documents in Project

Summary

SCH Number
2023100499
Lead Agency
Yucaipa Valley Water District
Document Title
Lift Station No. 4 Replacement Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Commercial Neighborhood (CN)
Document Description
The Lift Station No. 4 Replacement Project (the Project) generally consists of construction of a sewage lift station (New Lift Station No. 4) with a capacity of approximately 630 gallons per minute (gpm). The Project also includes demolition and removal of the Existing Lift Station No. 4, which is present on a portion of the Project site, is approaching the end of its useful service life, and has a capacity that is inadequate to serve future planned residential development within the lift station service area. A more detailed description of the Project is included in the Project Initial Study.

Contact Information

Name
Matthew Porras
Agency Name
Yucaipa Valley Water District
Job Title
Director of Engineering
Contact Types
Lead/Public Agency

Location

Cities
Calimesa
Counties
Riverside
Regions
Southern California
Cross Streets
Calimesa Boulevard, between Redwood Lane and Sandalwood Drive
Parcel #
413-210-039, 413-210-054

Notice of Completion

Development Types
Waste Treatment:Sewer (Sewage Lift Station)(MGD 0.9072)
Local Actions
Site Plan
Project Issues
Biological Resources, Cultural Resources, Geology/Soils, Tribal Cultural Resources
Public Review Period Start
Public Review Period End

Attachments

Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print