Annexation, Sphere of Influence, and Infrastructure Project

2 Documents in Project

Summary

SCH Number
2023100352
Lead Agency
Orland-Artois Water District (OAWD)
Document Title
Annexation, Sphere of Influence, and Infrastructure Project
Document Type
NOD - Notice of Determination
Received
Posted
11/28/2023
Document Description
The proposed Project includes annexation of 11,000 acres into the District boundary. To accomplish the annexation, the District, on behalf of the proposed annexed landowners, would apply to the Glenn LAFCO. The proposed Project would also include infrastructure needed to deliver water to the newly annexed parcels. The infrastructure components would include seven (7) turnouts (with pumps) on the TCC; twenty-four (24) new farm turnout locations; two (2) new pump stations (approximate capacity of 30 cubic-feet-per-second) added to existing pipelines; and approximately eight (8) miles of new pipeline. Designed facility capacities are based on projected peak demands and available topographical information. The proposed infrastructure would be constructed on either newly annexed private landowners’ property, existing District landowners’ property, Reclamation land adjacent to the TCC, on other private lands, and adjacent to and across several Glenn County roads. Spoils from infrastructure excavations would be managed on site and used as pipe backfill. No spoil material will be exported. The pipeline diameter would range from eight (8) to thirty (30) inches. Steel casing pipe may be used in areas where the exposed pipe passes through the TCC bank. Steel casing pipe diameter would be thirty (30) inches or smaller. The maximum depth of ground disturbance for pipelines and farm turnouts would be nine (9) feet, while the booster pump stations would have a maximum depth of eighteen (18) feet. Each construction area would contain temporary staging areas for construction equipment lay-down. Annexed lands will be considered Class 2 District users with the existing Class 1 District users taking precedence with respect to CVP District contracted water supplies.

Contact Information

Name
Emil Cavagnolo
Agency Name
Orland-Artois Water District
Job Title
General Manager
Contact Types
Lead/Public Agency

Location

Cities
Orland
Counties
Glenn
Regions
Northern California
Other Location Info
The Project is located in Glenn County, California, approximately 78 miles northwest of Sacramento and 55 miles south of Redding.

Notice of Determination

Approving Agency
Orland-Artois Water District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Glenn
Final Environmental Document Available at
Orland-Artois Water District, Office - 6505 County Road 27, Orland, CA 95963

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print