Orland-Artois Water District Annexation, Sphere of Influence Update, and Infrastructure Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Due to the Project’s large scope, Project lands contain various general plan land use and zoning designations.
Document Description
The proposed Project includes annexation of 11,000 acres into the District boundary. To accomplish the annexation, the District, on behalf of the proposed annexed landowners, would apply to the Glenn LAFCO. The proposed Project would also include infrastructure needed to deliver water to the newly annexed parcels. The infrastructure components would include seven (7) turnouts (with pumps) on the TCC; twenty-four (24) new farm turnout locations; two (2) new pump stations (approximate capacity of 30 cubic-feet-per-second) added to existing pipelines; and approximately eight (8) miles of new pipeline. Designed facility capacities are based on projected peak demands and available topographical information. The proposed infrastructure would be constructed on either newly annexed private landowners’ property, existing District landowners’ property, Reclamation land adjacent to the TCC, on other private lands, and adjacent to and across several Glenn County roads. Spoils from infrastructure excavations would be managed on site and used as pipe backfill. No spoil material will be exported. The pipeline diameter would range from eight (8) to thirty (30) inches. Steel casing pipe may be used in areas where the exposed pipe passes through the TCC bank. Steel casing pipe diameter would be thirty (30) inches or smaller. The maximum depth of ground disturbance for pipelines and farm turnouts would be nine (9) feet, while the booster pump stations would have a maximum depth of eighteen (18) feet. Each construction area would contain temporary staging areas for construction equipment lay-down. Annexed lands will be considered Class 2 District users with the existing Class 1 District users taking precedence with respect to CVP District contracted water supplies.

Contact Information

Name
Emil Cavagnolo
Agency Name
Orland-Artois Water District
Job Title
General Manager
Contact Types
Lead/Public Agency / Project Applicant

Name
Dena Giacomini
Agency Name
Provost & Pritchard Consulting Group
Job Title
Environmental Project Manager
Contact Types
Consulting Firm

Location

Cities
Orland
Counties
Glenn
Regions
Northern California
Other Location Info
The Project is located in Glenn County, California, approximately 78 miles northwest of Sacramento and 55 miles south of Redding.

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 3 (DOT), California Department of Water Resources (DWR), California Governor's Office of Emergency Services (OES), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Regional Water Quality Control Board, Central Valley Redding Region 5 (RWQCB), Central Valley Flood Protection Board, Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, District 21, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance, California Department of Fish and Wildlife, North Central Region 2 (CDFW)
State Reviewing Agency Comments
California Department of Fish and Wildlife, North Central Region 2 (CDFW)
Development Types
Other (Annexation, Sphere of Influence Update, and Infrastructure )
Local Actions
Water Delivery Infrastructure
Project Issues
Biological Resources, Cultural Resources, Geology/Soils, Tribal Cultural Resources

Attachments

Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from state reviewing agencies]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print