Cherry Avenue Industrial Project

3 Documents in Project

Summary

SCH Number
2023100342
Lead Agency
City of Long Beach
Document Title
Cherry Avenue Industrial Project
Document Type
NOD - Notice of Determination
Received
Posted
7/22/2024
Document Description
The Project applicant proposes to demolish the 8 existing buildings on the Project site and redevelop the site with a single, approximately 304,344 SF, concrete, tilt-up light-industrial warehouse building. The proposed building would be 51 feet high and surrounded by parking areas that would include 336 at-grade parking stalls and 76 truck parking stalls. Passenger vehicle parking would be situated in front of the proposed building, along Cherry Avenue, along the south side of the lot, and in the rear of the building in the northeast corner of the lot. The building would feature 44-truck high- dock doors along the south elevation facing the abutting commercial site. Approximately 10,066 SF of office space would be accommodated in the southwest corner of the building along Cherry Avenue.

Contact Information

Name
Amy Harbin
Agency Name
City of Long Beach
Job Title
Planner
Contact Types
Lead/Public Agency

Location

Cities
Long Beach
Counties
Los Angeles
Regions
Southern California
Cross Streets
Cherry Avenue and South Street
Zip
90805
Total Acres
14.16
State Highways
I -710 and SR 91

Notice of Determination

Approving Agency
City of Long Beach
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
https://www.longbeach.gov/lbcd/planning/environmental/reports/

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print