TTM 20571 - Madera at Citrus Trail Residential Project

2 Documents in Project

Summary

SCH Number
2023100328
Lead Agency
City of Redlands
Document Title
TTM 20571 - Madera at Citrus Trail Residential Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Low-Density Residential / Single-Family Residential (R-1)
Document Description
The proposed project involves the construction of 103 new single-family homes, ranging between 1,544 and 1,858 square feet each, along with associated landscaping and internal roadway improvements. The project also includes a General Plan Amendment (GPA) from Low Density Residential to Medium Density Residential; a new Specific Plan for residential development with applicable development standards; and a Tentative Tract Map to subdivide approximately 9.01 acres for condominium purposes. All proposed house plan types would have two stories and two-car garages. The proposed residences would range in height from 27 feet to 30 feet, and would be designed in three plan types with various architectural styles associated with each plan. Development of the project would also include 206 garage parking stalls and 70 guest parking stalls, totaling 276 parking stalls. Approximately 65,470 square feet (1.5 acres) of the site would be landscaped. Landscaping includes the front, side, and backyards of the housing units, sidewalk landscaping within the development area and on outwardly facing Colton Avenue and Wabash Avenue, as well as the private community park located within the center of the project site. The remainder of the site would be paved, including sidewalks, private streets within the neighborhood, and driveways. Vehicle access to and from the project site would be provided via three new private internal streets connecting Colton Avenue and Wabash Avenue. From these streets, there would be drive aisles that would provide direct access to residential units. Project construction is anticipated to begin in early 2024 and last approximately 14 months.

Contact Information

Name
Ryan Murphy
Agency Name
City of Redlands
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Name
Cameron Hile
Agency Name
MIG, Inc.
Job Title
Senior Analyst
Contact Types
Consulting Firm

Location

Cities
Redlands
Counties
San Bernardino
Regions
Citywide
Cross Streets
East Colton Avenue and Wabash Avenue
Zip
92373
Total Acres
9.01
Parcel #
0168-291-02
State Highways
Interstate 10 and Interstate 210
Railways
Metrolink
Airports
San Bernardino International
Schools
Multiple
Waterways
Mission Channel
Township
1S
Range
3W
Section
24
Base
SBPM

Notice of Completion

Development Types
Residential (Single-Family Homes)(Units 103, Acres 9.01)
Local Actions
General Plan Amendment, Specific Plan, Site Plan, Land Division (Subdivision, etc.)
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Public Review Period Start
Public Review Period End

Attachments

Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print