PG&E Antioch Service Center Project

2 Documents in Project

Summary

SCH Number
2023100100
Lead Agency
City of Antioch
Document Title
PG&E Antioch Service Center Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
General Plan: Specific Plan Focus Area, Industrial/Utilities. Zoning: Planned Development District (PD)
Document Description
The proposed project involves the demolition and replacement of four existing buildings on the project site, the Fleet Maintenance, Logistics Warehouse, Logistics Shops, and Operations buildings on a 36.39-acre project site consisting of one parcel at 2111 Hillcrest Avenue, in Antioch California. Construction of the proposed project would include the new Logistics Warehouse building, an approximately 54,000 square foot single-story building located in the center of the project site, east of the existing Fleet Maintenance building; the new Logistics Shops building, an approximately 53,000 square foot single-story building located in the center of the project site, east of the existing Fleet Maintenance building; the new Fleet Maintenance building, an approximately 20,000 square foot single-story building located in the southwestern corner of the project site; and the new Operations building, an approximately 51,000 square foot two-story building located along the northern area of the project site, along Hillcrest Avenue. Additionally, the proposed project would include the construction of new non-occupied support structures, a below grade parking area, circulation improvements, expansion of paved surfaces, and expansion of lighting infrastructure. The project would require City approval of the following: Planned Development Rezone, Final Development Plan, Use Permit, and Design Review.

Contact Information

Name
Zoe Merideth
Agency Name
City of Antioch Planning Division
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Name
Edward Heming
Agency Name
LSA Associates Inc.
Job Title
Principal
Contact Types
Consulting Firm

Name
Richard Price
Agency Name
Pacific Gas and Electric Company
Job Title
DGA
Contact Types
Project Applicant

Location

Cities
Antioch
Counties
Contra Costa
Regions
Citywide, Northern California, San Francisco Bay Area
Cross Streets
NA
Zip
94531
Total Acres
36.39
Parcel #
051-160-002
State Highways
SR 4, SR 160
Railways
Amtrak & BNSF
Airports
NA
Schools
1 High, 1 Elementary
Waterways
San Joaquin River
Township
2N
Range
2E
Section
20
Base
Diablo

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Parks and Recreation, California Department of Resources Recycling and Recovery, California Department of Toxic Substances Control (DTSC), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California San Joaquin River Conservancy (SJRC), California State Lands Commission (SLC), Central Valley Flood Protection Board, Delta Protection Commission, Delta Stewardship Council, Office of Historic Preservation, State Water Resources Control Board, Division of Water Quality, California Department of Transportation, District 4 (DOT), California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
State Reviewing Agency Comments
California Department of Transportation, District 4 (DOT), California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB)
Development Types
Other ( Service Center Facilities )
Local Actions
Planned Unit Development, Rezone, Use Permit
Project Issues
Aesthetics, Air Quality, Biological Resources, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Noise, Public Services, Septic System, Sewer Capacity, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation
Public Review Period Start
Public Review Period End

Attachments

Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from state reviewing agencies]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print