Timber Harvest Plan “Sulphur” 1-22-00090 SCR (Streambed Alteration Agreement No. EPIMS-SCR- 33826-R3)
Summary
SCH Number
2023100081
Lead Agency
California Department of Forestry and Fire Protection
(CAL FIRE)
Document Title
Timber Harvest Plan “Sulphur” 1-22-00090 SCR (Streambed Alteration Agreement No. EPIMS-SCR- 33826-R3)
Document Type
NOD - Notice of Determination
Received
Posted
10/2/2023
Document Description
The project is limited to the installation of one temporary Spittler crossing on a Class II watercourse that will be replaced upon completion of timber operations by a rocked ford crossing at map point SF3, two road alignments at map point HM 1 and HM 2 along a Class I watercourse, and a culvert replacement at map point WC 1 on a Class II watercourse.
Contact Information
Name
Katanja Waldner
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Location
Cities
Unincorporated area
Counties
Santa Cruz
Regions
Northern California, San Francisco Bay Area
Other Location Info
The project is located at East Branch Soquel Creek and unnamed tributary to Soquel Creek, a Class I watercourse, in the County of Santa Cruz, State of California; Sections 5, 6, 7, 8, and 12, Township 10 South, Range 1 East, U.S. Geological Survey (USGS) map Laurel, Mount Diablo base and meridian; 29400 Highland Way, Los Gatos, CA, 95022; Assessor’s Parcel Numbers 099-181-02, 099-181-03, 099-181-04, and 099-181-06.
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sonoma
Final Environmental Document Available at
2825 Cordelia Road, Suite 100
Fairfield, CA 94534
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.