Permit No. 19792 - Upper Swanston Ranch, Inc. Irrigation and Fish Passage Improvement Project

5 Documents in Project

Summary

SCH Number
2023090717
Lead Agency
California Department of Water Resources (DWR)
Document Title
Permit No. 19792 - Upper Swanston Ranch, Inc. Irrigation and Fish Passage Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
7/1/2024
Document Description
Approval of Permit No. 19792, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: This project modifies an irrigation channel with a pump station west of Tule Canal. The station will have a deep wet well (14-foot by 16-foot concrete, 16 feet deep) and two 14-inch diameter cone screens on a concrete pad (within a 20 feet deep sheet pile enclosure). Pipes (36 inch) connect the screens to the pump station and a 48-inch HDPE pipe (3,300 feet) carries water to a revamped holding reservoir north of the station. The reservoir will have a new water control structure for drainage back to Tule Canal, rock slope protection, and future pipe expansion capabilities. The project also includes stability testing (boreholes), safe access (stairs and railings), and removal of abandoned wood piers.

Contact Information

Name
Jamie Silva
Agency Name
Central Valley Flood Protection Board
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
Yolo
Regions
Northern California
Other Location Info
The project is located adjacent to Tule Canal on the right bank in the Yolo Bypass in Yolo County, CA.

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Yolo
Final Environmental Document Available at
The environmental document is available to the general public at the lead agency's office. The Central Valley Flood Protection Board's (Board’s) administrative record related to the approval of this encroachment permit is available for public review at the Board's office. Please note, the signed NOD is not attached. If you would like to request a signed copy of the NOD, please contact Board staff at: questions@cvflood.ca.gov.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.