Winding Way Aquifer Storage and Recovery Well Project

4 Documents in Project

Summary

SCH Number
2023090690
Lead Agency
Carmichael Water District
Document Title
Winding Way Aquifer Storage and Recovery Well Project
Document Type
NOD - Notice of Determination
Received
Posted
11/5/2024
Document Description
The proposed project would construct a new water supply well with ASR capacity. The Winding Way ASR Well would produce approximately 1,500 gallon per minute (gpm) and have a recharge capacity of approximately 750 gpm. The project would include related above ground improvements including a fenced perimeter, site paving, installation of a pedestal to rest the motor on, installation of a pump, and constructing a small (8 by 12 feet) prefabricated building to house the chlorine and equipment, a pad to rest electrical equipment and instrumentation controls cabinet and a small shade structure to protect it.

Contact Information

Name
Michelle Jesperson
Agency Name
Department of Water Resources
Job Title
Environmental Program Manager I
Contact Types
Responsible Agency

Location

Cities
Carmichael
Counties
Sacramento
Regions
Citywide
Cross Streets
Charleston Drive and Rustic Road

Notice of Determination

Approving Agency
Department of Water Resources
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
715 P Street, Sacramento, CA 95814

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Mitigation Monitoring and Reporting Program)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print