Los Osos Community Services District Resiliency Intertie Project
2 Documents in Project
Summary
SCH Number
2023090611
Lead Agency
Los Osos Community Services District
Document Title
Los Osos Community Services District Resiliency Intertie Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Public right-of-way (adjacent to County Open Space and Agriculture land use designations and City Open Area zoning)
Document Description
The Los Osos Community Services District (LOCSD), the project applicant, proposes the construction and operation of an intertie to the Chorro Valley Pipeline to provide an alternative source of potable for the LOCSD. The project would involve the construction of an intertie to the Chorro Valley Pipeline and the installation of an approximately 2.5-mile pipeline. The proposed intertie would consist of a vault with piping, meter, valves, and may also consist of a booster pump station that would facilitate a controlled and metered flow of potable water to the LOCSD. It is anticipated that state water could provide up to 200 acre-feet per year (AFY) of water supply.
Contact Information
Name
Brandi Cummings
Agency Name
SWCA Environmental Consultants
Job Title
Lead Environmental Planner
Contact Types
Consulting Firm
Phone
Email
Name
Ron Munds
Agency Name
Los Osos Community Services District
Job Title
General Manager
Contact Types
Lead/Public Agency / Project Applicant
Phone
Email
Location
Coordinates
Cities
Morro Bay, unincorporated area - Los Osos
Counties
San Luis Obispo
Regions
Southern California, Unincorporated
Cross Streets
Santa Ysabel Ave. at South Bay Blvd.; South Bay Blvd. at Quintana Road; Quintana Road at White P
Zip
93405
Parcel #
n/a public right-of-way
State Highways
1
Railways
n/a
Airports
n/a
Schools
Los Osos Middle, Family Partnership Charter, Baywood Elementary
Waterways
Los Osos Creek, Chorro Creek, Morro Bay State Estuary, Pacific Ocean
Township
29/30S
Range
10E
Section
00
Base
MBPM
Other Location Info
The project alignment consists of an approximately 2.5-mile segment of South Bay Boulevard, Quintana Road, and Highway 1 (MND Figure 1). The intertie (to the Chorro Valley Pipeline) would be constructed to the north of the southbound lane of Highway 1 and the proposed pipeline alignment would begin at this location, cross under Highway 1 and extend south toward Quintana Road, west along Quintana Road toward South Bay Boulevard, south along South Bay Boulevard, and would terminate at the LOCSD’s basin at the intersection of Santa Ysabel Avenue and South Bay Boulevard (MND Figure 2). The entire project would be located within the public right-of-way (ROW) and within the unincorporated San Luis Obispo county, under the jurisdiction of the County of San Luis Obispo (County), except for the portion of the project beginning approximately 600 feet north of the Cerro Cabrillo Trailhead/Quarry Trailhead parking lot/turnout to approximately 1,200 feet south of the South Bay Boulevard and Quintana Road intersection, which would be located in Morro Bay city under the jurisdiction of the City of Morro Bay (City). The entire project alignment and intertie location is located within the California Coastal Zone and portions of the alignment are located within original and appellate jurisdiction of the California Coastal Commission (CCC).
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Coastal Commission (CCC), California Department of Fish and Wildlife, Central Region 4 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Transportation, District 5 (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Coast Region 3 (RWQCB), California State Lands Commission (SLC), Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, District 6, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance, State Water Resources Control Board, Division of Drinking Water
State Reviewing Agency Comments
State Water Resources Control Board, Division of Drinking Water
Development Types
Other (water intertie and booster pump station and pipeline)
Local Actions
Coastal Permit, infrastructure
Project Issues
Aesthetics, Air Quality, Biological Resources, Coastal Zone, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Public Review Period Start
Public Review Period End
Attachments
Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from state reviewing agencies]
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.