Permanent Transfer of 617 acre-feet of Maximum Annual Table A Amount from Tulare Lake Basin Water Storage District to Empire West Side lrrigation District

5 Documents in Project

Summary

SCH Number
2023090554
Lead Agency
Tulare Lake Basin Water Storage District
Document Title
Permanent Transfer of 617 acre-feet of Maximum Annual Table A Amount from Tulare Lake Basin Water Storage District to Empire West Side lrrigation District
Document Type
NOD - Notice of Determination
Received
Posted
4/11/2024
Document Description
The project is a permanent transfer of 617 acre-feet of Tulare Lake Basin Water Storage District's (Tulare's) State Water Project (SWP) Maximum Annual Table A Amount to Empire West Side lrrigation District (Empire). Tulare and Empire are SWP Contractors with long-term water supply contracts with the California Department of Water Resources (DWR), which contracts allow for transfers of SWP water between SWP Contractors subject to DWR approval.

Contact Information

Name
Cameron Batth
Agency Name
Tulare Lake Basin Water Storage District
Job Title
Water Resource Engineer
Contact Types
Lead/Public Agency

Location

Counties
Kings
Regions
Countywide
Other Location Info
Empire West Side Irrigation District service area Kings County

Notice of Determination

Approving Agency
Department of Water Resources
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Kings
Final Environmental Document Available at
Empire West Side Irrigation District, 5065 19 1/2 Avenue, Riverdale, California 93656

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print