Ethanac Logistics Center

2 Documents in Project

Summary

SCH Number
2023090525
Lead Agency
City of Perris
Document Title
Ethanac Logistics Center
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
Commercial Community/ Community Commercial
Document Description
The Ethanac Logistics Center (proposed Project) includes all on and offsite improvements and involves the merging of ten parcels at the Project site to create one approximately 20-gross-acre parcel for the construction and operation of a 412,348-square-foot building including infrastructure, appurtenances, associated parking areas, and associated offsite supporting improvements. The building is proposed to accommodate high-cube warehouse distribution uses, anticipating that 50,000 square feet could be utilized for cold-refrigerated storage and 15,000 square feet for supporting office uses. The warehouse is not anticipated to include e-commerce. The building would include some solar panels on the rooftop, 32 dock doors on the east side, and 29 dock doors on the west side. The building height would not exceed the City’s maximum standard of 50 feet. The proposed Project would be constructed as a speculative or “spec” building; that is, there is not a specific tenant identified at this time. It is anticipated that the building could operate 24 hours a day, seven days a week. The design of the building is modern industrial and includes concrete tilt-up wall construction with board-formed cement veneer and standard window glazing. The Project is proposed to be consistent with City standards and provide 14-foot-high screen walls and perimeter landscaping along the Project site’s frontage. The Project site’s automobile entrance would be separate from the truck entrance. Automobile vehicles would access the Project site via two driveways along Ethanac Road. Trucks would access the site via two separate driveways along Trumble Road. Emergency access would also be available from Trumble Road. No access is proposed to be offered from Sherman Road. Domestic water services in the Project vicinity are provided by the Eastern Municipal Water District (EMWD). There are existing water lines near the Project site: 12-inch diameter waterline in Trumble Road; 20-inch diameter waterline and 18-inch brackish waterline in Ethanac Road; 8-inch diameter waterline, 18-inch brackish waterline, brackish water blowoff valve, and fire hydrant in Sherman Road; as well as a 12-inch waterline in Sherman south of Ethanac Road. There is also an existing 8-inch water line in Illinois Avenue. The Project would connect to the 12-inch waterline in Trumble Road. The Project would also provide a diesel-powered fire flow pump that would be used for fire flow demands. The fire flow pump would only be used during fire emergencies and routine testing and would not be part of the Project’s normal daily operations. No offsite water line improvements are proposed. Recycled water services in the Project vicinity are also provided by the EMWD. Recycled water services in the Project vicinity are also provided by the EMWD. There are no existing recycled water lines adjacent to the Project site. The closest recycled water lines are within Case Road, west of I-215 and within McLaughlin Road, south of the Project site over half a mile away. The sizing of those recycled water lines do not account for irrigation demands from this proposed Project and the EMWD will not require extension of those lines. There are nearby projects in development that may result in construction of recycled water facilities closer to the Project site. The Project would include recycled water irrigation facilities that would connect to future recycled water facilities. In the meantime, irrigation lines within the Project site would connect to the existing 12-inch waterline in Trumble Road. Sewer (wastewater) collection and treatment services in the Project vicinity are also provided by the EMWD. There is an existing 15-inch sewer line in Ethanac Road, an existing 10-inch sewer line in Trumble Road, and an existing 8-inch sewer line in Sherman Road (south of Ethanac Road). The Project would connect to the existing 15-inch sewer line in Ethanac Road. No offsite sewer line improvements are proposed. The Project site is located within Zone D of the March Air Reserve Base/Inland Port Airport Land Use Compatibility Plan (MARB/IPA ALUCP). As such, the Project has been reviewed by the Riverside County Airport Land Use Commission (ALUC) to ensure compatibility with the MARB/IPA ALUCP. The ALUC determined via a public hearing June 8, 2023, that the Project is consistent with the MARB/IPA ALUCP. Offsite Improvements The Project includes approximately 12 acres of offsite improvements are associated with storm drain facilities and roadway improvements. Drainage improvements would require an extension of City Line A, located along the west side of Trumble Road. Drainage improvements would extend from the Project site north in Trumble Road to Illinois Avenue and then west to I-215 in order to connect to existing MDP Line A-11 and ultimately MDP Line A. Construction of this line and repaving of Trumble Road would require an encroachment permit from the City of Menifee since improvements may extend slightly beyond the centerline and for construction traffic control. The Project may also be required to improve the intersection of Ethanac and Trumble Roads along frontage of the not-a-part parcel identified on the Development Plan. These improvements would also require an encroachment permit from the City of Perris for construction traffic control and potential encroachment over the roadway centerline. Project Construction and Site Preparation Project construction would not be phased and is anticipated to begin in Fall 2024. Construction is anticipated to be completed in 2025. Nighttime pouring of concrete is anticipated during summer months. The Project site grading would provide 15,600 cubic yards (CY) of cut and 66,100 CY of fill; hence will require 50,500 CY of soil import.

Contact Information

Name
Nathan Perez
Agency Name
City of Perris - Planning Division
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Location

Cities
Perris
Counties
Riverside
Regions
Citywide
Cross Streets
Trumble Road and Ethanac Road
Zip
92570
Total Acres
32
Jobs
400
Parcel #
329-240-016 through -020 and -023 through -027
State Highways
I-215, SR-74
Railways
BNSF
Airports
N/A
Schools
Various
Waterways
Perris Valley Storm Drain Channel
Township
5S
Range
3W
Section
10
Base
SBBM

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 8 (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), California State Lands Commission (SLC), Office of Historic Preservation, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Division of Water Rights, California Native American Heritage Commission (NAHC), California Department of Fish and Wildlife, Inland Deserts Region 6 (CDFW)
State Reviewing Agency Comments
California Native American Heritage Commission (NAHC), California Department of Fish and Wildlife, Inland Deserts Region 6 (CDFW)
Development Types
Industrial (Sq. Ft. 412348, Acres 20, Employees 400)
Local Actions
General Plan Amendment, Site Plan, Rezone, Land Division (Subdivision, etc.)
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Public Review Period Start
Public Review Period End

Attachments

Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from state reviewing agencies]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print