South Date Canal Pipeline Project

Summary

SCH Number
2023090215
Public Agency
Imperial Irrigation District
Document Title
South Date Canal Pipeline Project
Document Type
NOE - Notice of Exemption
Received
Posted
9/11/2023
Document Description
The County of Imperial will be replacing the Clark Road bridge over the Central Main Canal. This project will pipeline approximately 150 linear feet of the South Date Canal from the heading north to mitigate impacts to IID facilities as a result of the bridge replacement. This project includes the replacement of an existing pipe. The IID will be responsible for the cost to replace the existing 60-feet of pipe.

Contact Information

Name
Brooke Goodsell
Agency Name
Imperial Irrigation District
Job Title
Environmental Specialist I
Contact Types
Lead/Public Agency

Location

Counties
Imperial
Regions
Countywide
Cross Streets
South Clark Rd and Jasper Rd

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Class 2; CA Code of Regulations, Title 14, Section 15302
Reasons for Exemption
IID’s Environmental team has reviewed the project and has determined that the project is exempt from further environmental analysis as a categorical exemption under the California Environmental Quality Act, California Public Resources Code Sections 21000 et seq., and specifically under section 15302 of the State CEQA Guidelines, Title 14 of the California Code of Regulations, Chapter 3. Section 15302 provides a Class 2 categorical exemption for replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced, including but not limited to the replacement or reconstruction of existing utility systems and/or facilities involving negligible or no expansion of capacity. The South Date Canal Pipeline project is located within the South Date Canal, an existing facility, and involves the pipelining of 150 linear feet of the canal (60 ft. of which are already pipelined and will be replaced). These improvements are necessary to mitigate impacts to IID facilities as a result of the bridge replacement, and involves negligible or no expansion of use of the South Date Canal.
County Clerk
Imperial

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print