Jenny Lind Water System Tank A-B Water Transmission Pipeline Project

2 Documents in Project

Summary

SCH Number
2023090007
Lead Agency
Calaveras County Water District (CCWD)
Document Title
Jenny Lind Water System Tank A-B Water Transmission Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
3/18/2024
Document Description
The Project proposes to install 20,000 feet of potable water transmission main (between 12-14-inch diameter transmission lines) to remove an existing hydraulic transmission bottleneck and improve conveyance to Tank B and install connections for new or replaced laterals. The pipeline will be placed in trenches within existing paved roads of the community of Rancho Calaveras in Calaveras County, California. The new pipeline will be installed parallel to the existing transmission system lines from Tank A on Hart Vickson Lane, continuing down Baldwin Street, Usher Drive, Wind River Drive, and continuing to Tank B on Wind River Drive.

Contact Information

Name
Mark Rincon-Ibarra
Agency Name
CCWD
Job Title
District Engineer
Contact Types
Lead/Public Agency

Location

Counties
Calaveras
Regions
Countywide
Cross Streets
Hart Vickson Lane and Wind River Drive
Zip
95249
Total Acres
35.32
Other Location Info
The approximately 35.32-acre Study Area is located within the Calaveras County Right-of-Way (ROW) in Rancho Calaveras, Calaveras County, California. The project begins at Tank A on Hart Vickson Lane heading south, turns south on Baldwin Street, heads southeast on Usher Drive, turns east up Wind River Drive, continues east on Wind River Drive, and ends at Tank B.

Notice of Determination

Approving Agency
Calaveras County Water District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Calaveras
Final Environmental Document Available at
https://ccwd.org/wp-content/uploads/2023/08/Jenny-Lind-ISMND_Final_Feb_2024.pdf

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]
Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.