Pacific Gas and Electric Company L-021A Napa River Pipeline Crossing Replacement Project

4 Documents in Project

Summary

SCH Number
2023080342
Lead Agency
California State Lands Commission (SLC)
Document Title
Pacific Gas and Electric Company L-021A Napa River Pipeline Crossing Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
10/20/2023
Document Description
The Project would authorize PG&E to replace three existing, 8-inch-diameter pipelines (L-021A, L-021 A-1, and L-021 A-2) with a new 26-inch diameter pipeline under the Napa River during Phase 1. During Phase 2, PG&E would remove the existing pipelines under the Napa River (CSLC lease PRC 5438) and decommissioning in place the pipeline in the adjacent upland areas (outside of CSLC jurisdiction). The State Lands Commission action is an approval of a 20-year General Lease – Right-of-Way Use through October 18, 2043.

Contact Information

Name
Afifa Awan
Agency Name
State Lands Commission
Job Title
Senior Environmental Scientist
Contact Types
Lead/Public Agency

Location

Cities
Napa
Counties
Napa
Regions
San Francisco Bay Area
Cross Streets
Stanley Lane in the city of Napa and Soscol Ferry Road
Zip
94558
Total Acres
17.9 acres
Parcel #
28-091-000
State Highways
Highway 12
Railways
Union Pacific Railroad
Airports
Napa County Airport
Schools
McGrath School and Irene M. Snow Elementary School
Waterways
Napa River and Suscol Creek
Township
T5N
Range
R4W
Section
34
Base
MDM
Other Location Info
The Project area begins near Suscol Creek in the unincorporated Napa County, extends west across the Napa River, and terminates in the Highway 12 right-of-way near Stanley Lane in the city of Napa, California.

Notice of Determination

Approving Agency
State Lands Commission
Approving Agency Role
Lead Agency
Approved On
County Clerk
Napa
Final Environmental Document Available at
https://www.slc.ca.gov/ceqa/pge-021a/

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print