MD-40 Sunset Ridge Water System Improvements
Summary
SCH Number
2023080180
Public Agency
Madera County
Document Title
MD-40 Sunset Ridge Water System Improvements
Document Type
NOE - Notice of Exemption
Received
Posted
8/8/2023
Document Description
The existing MD-40 wells have been producing water out of compliance with secondary drinking water standards for Iron and Manganese within the last 12 months. On August 27, 2021, the Madera County Environmental Health Division issued a compliance order for the MD-40 water system to comply with CCR, Title 22, section 64449 for Iron and Manganese by September 2024. The Planning project will analyze the water system to identify feasible alternatives that address existing system deficiencies, and also complete a consolidation evaluation with nearby water systems.
Contact Information
Name
Kamara Biawogi
Agency Name
County of Madera Public Works Department
Job Title
Planner III
Contact Types
Lead/Public Agency
Phone
Location
Cities
Madera
Counties
Madera
Regions
Countywide
Other Information
Maintenance District 40 Sunset Ridge
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15306
Reasons for Exemption
The project will be the planning phase for new water system improvements that may include, but are not limited to, pipelines, water storage, meters, groundwater wells, and hydrants. Project scope will only be for the preliminary engineering work that has the categorical & statutory exemptions noted above. The project scope will include the following if applicable: CEQA construction evaluation, feasibility/planning study, consolidation evaluation, test well drilling, designs/specifications/cost estimates, and pilot study.
Exempt Status
Statutory Exemption
Type, Section or Code
15262
Reasons for Exemption
The project will be the planning phase for new water system improvements that may include, but are not limited to, pipelines, water storage, meters, groundwater wells, and hydrants. Project scope will only be for the preliminary engineering work that has the categorical & statutory exemptions noted above. The project scope will include the following if applicable: CEQA construction evaluation, feasibility/planning study, consolidation evaluation, test well drilling, designs/specifications/cost estimates, and pilot study.
County Clerk
Madera
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.