Nonindustrial Timber Management Plan “Anderson” 1-23NTMP-00001 SON (Streambed Alteration Agreement No. EPIMS-SON-38208-R3)
Summary
SCH Number
2023070438
Lead Agency
California Department of Forestry and Fire Protection
(CAL FIRE)
Document Title
Nonindustrial Timber Management Plan “Anderson” 1-23NTMP-00001 SON (Streambed Alteration Agreement No. EPIMS-SON-38208-R3)
Document Type
NOD - Notice of Determination
Received
Posted
7/21/2023
Document Description
The project is limited to the replacement of culverts at two Class II crossings, installation of a culvert at one Class III crossing, installation of rock armored fords at five Class III crossings, installation of a rock filled ford at one Class III crossing, installation of one temporary single layer Spittler crossing at a Class II crossing, installation of one temporary single layer Spittler crossing at the confluence of a Class II and Class III watercourse, and installation one temporary Spittler crossing at a Class II crossing.
Contact Information
Name
Amanda Ma
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Location
Cities
unincorporated area
Counties
Sonoma
Regions
Northern California, San Francisco Bay Area
Other Location Info
The project is located at unnamed Class II and Class III watercourse tributaries to Kidd Creek, a Class I watercourse, in the County of Sonoma, State of California; Section 29, Township 8N, Range 11W, U.S. Geological Survey (USGS) map Cazadero 7.5’ Quadrangle, Mt. Diablo base and meridian.
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sonoma
Final Environmental Document Available at
2825 Cordelia Road, Suite 100
Fairfield, CA 94534
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.