Timber Harvest Plan “Full Volume” 1-22-00097 SON (Streambed Alteration Agreement No. EPIMSSON-33487-R3)

Summary

SCH Number
2023070396
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Timber Harvest Plan “Full Volume” 1-22-00097 SON (Streambed Alteration Agreement No. EPIMSSON-33487-R3)
Document Type
NOD - Notice of Determination
Received
Posted
7/20/2023
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number EPIMS-SON-33487-R3 pursuant to section 1602 of the Fish and Game Code to the project Applicant, Chris Hayter, Mendocino Redwood Company. The project is limited to the removal and replacement of culverts at five Class III crossings and four Class II crossings, removal of six Class III temporary crossings, shotgun repair at a Class III crossing, installation of a rockfill crossing at one Class III crossing, rock installation at two Class III crossings, and installation of road dips at two Class III crossings.

Contact Information

Name
Amanda Ma
Agency Name
CA Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
Sonoma
Regions
San Francisco Bay Area
Other Location Info
The project is located at unnamed tributaries to the Wheatfield Fork Gualala River in the County of Sonoma, State of California; Sections 18, 19, 20, 27, 28, 30, 33, and 34, Township 10N, Range 13W; Sections 24 and 25, Township 10N, Range 14W, U.S. Geological Survey (USGS) map Annapolis 7.5’ Quadrangle, Mount Diablo Base and Meridian.

Notice of Determination

Approving Agency
CA Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print