Mountain Gate Community Services District - Emergency Water Supply Improvement Project

Summary

SCH Number
2023070187
Public Agency
Mountain Gate Community Services District
Document Title
Mountain Gate Community Services District - Emergency Water Supply Improvement Project
Document Type
NOE - Notice of Exemption
Received
Posted
7/11/2023
Document Description
The project includes improvements to the Mountain Gate Community Services District (MGCSD) water supply system that are required in order to replace aging infrastructure and equipment, and ensure a safe and reliable potable water supply for MGCSD customers. The Beaver Island Pump Station and the Lake Booster Pump Station are both located on U.S. Forest Service (USFS) land just above the high-water mark of Shasta Lake with limited access and space for permanent emergency generators. Therefore, project improvements consist of purchasing portable generators and installing manual transfer switches at both pump stations. Improvements at three of the District’s wells (Well 1A, Well 2, Well 3) include demolishing and replacing existing well and chlorination components; cleaning and air-developing the wells; installing new pitless adapters and protective bollards; and making various electrical upgrades including installing Supervisory Control and Data Acquisition (SCADA) equipment. In addition, the existing portable emergency generator utilized to power Wells 1A, 2, and 3 during power outages would be replaced with a new portable emergency generator at the Well 1A site.

Contact Information

Name
Jeff Cole
Agency Name
Mountain Gate Community Services District
Job Title
General Manager
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Mountain Gate (unincorporated)
Counties
Shasta
Regions
Unincorporated
Cross Streets
Bass Drive, Tunnel Road
Parcel #
085-280-019, 307-010-001, 307-170-010, 307-170-011, 307-170-005
State Highways
Interstate 5
Railways
Union Pacific Railroad
Airports
Tews Field
Schools
Grand Oaks Elementary School
Waterways
Shasta Lake, West Fork Stillwater Creek, Spring Branch Creek
Base
MDM
Other Location Info
Booster pump station improvements would occur in Section 33, Township 34N, Range 4W and Section 4, Township 33N, Range 4W of the U.S. Geological Survey's (USGS) O'Brien 7.5-minute quadrangle and well improvements would occur at three separate locations in Section 16, Township 33N, Range 4W, of the USGS Project City 7.5-minute quadrangle.

Notice of Exemption

Exempt Status
Ministerial
Type, Section or Code
CCR, Title 14, Section 15268
Reasons for Exemption
The proposed MGCSD booster pump station and well improvements do not require discretionary review by Shasta County or any other public agency; therefore, the project is ministerially exempt.
County Clerk
Shasta

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print