Site Plan Review No. 23-004

4 Documents in Project

Summary

SCH Number
2023060708
Lead Agency
City of Lancaster
Document Title
Site Plan Review No. 23-004
Document Type
NOD - Notice of Determination
Received
Posted
10/19/2023
Document Description
The proposed project consists of the construction and operation of a 647,756 square foot industrial/distribution warehouse on approximately 38 acres at the northeast corner of 45th Street West and Avenue G (see Figure 2). The proposed building would be centrally located within the project site, tilt-up concrete construction and approximately 50 feet in height. Most of the building would be utilized for storage and distribution purposes; however, up to 40,000 square feet of the proposed building would be utilized for office space. No cold or frozen storage would occur at this facility. Loading docks and trailer parking spaces would located on the north and south sides of the building. Employee and visitor parking would be located on the eastern and western sides of the building. A total of 94 loading dock spaces would be provided, evenly split between the two sides of the building; 48 loading docks would be installed with an additional 46 loading dock punch-outs available. 148 trailer parking spaces would be provided located near the loading dock areas. A total of 447 parking spaces would be provided for employees and visitors to the site. including 14 ADA spaces and 89 EV charging spaces along with 44 spaces for bicycle parking. Access to the project site would be from one driveway on Avenue G at the southeast corner of the project site and two driveways located along 45th Street West. In addition to the building and parking on the site, landscaping would be provided throughout including in the employee parking lot and around the perimeter of the site. Enhanced landscaping will be provided along Avenue G to screen the loading docks from public view. Other improvements on the project site would include drainage basins, lighting, fencing, and utility improvements. Roof-top and battery storage would be installed to the extent feasible. Construction of the proposed project is anticipated to start in October 2023 and take approximately 12 months to complete ending in October 2024. Construction activities would occur Monday through Saturday, 7:00 a.m. to 8 p.m., with construction not occurring on Sundays and holidays. No import or export of material is anticipated during construction. The facility is anticipated to employ 242 individuals and could operate 24-hours per day.

Contact Information

Name
Jocelyn Swain
Agency Name
City of Lancaster
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Location

Cities
Lancaster
Counties
Los Angeles
Regions
Citywide, Countywide
Cross Streets
45th Street West, Avenue G
Zip
93536
Total Acres
38
Jobs
242
Parcel #
3105-001-011, -012, -013, -014
State Highways
N/A
Railways
N/A
Airports
General William J. Fox Airfield
Schools
N/A
Waterways
N/A
Township
8N
Range
13W
Section
36
Base
SBBM

Notice of Determination

Approving Agency
City of Lancaster
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
www.cityoflancasterca.org; City of Lancaster, 44933 Fern Avenue, Lancaster, CA 93534

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print