Streambed Alteration Agreement EPIMS No. 32654-R1 "Guppy" Timber Harvesting Plan (THP)1-22-00115-HUM
Summary
SCH Number
2023060510
Lead Agency
California Department of Forestry and Fire Protection
(CAL FIRE)
Document Title
Streambed Alteration Agreement EPIMS No. 32654-R1 "Guppy" Timber Harvesting Plan (THP)1-22-00115-HUM
Document Type
NOD - Notice of Determination
Received
Posted
6/19/2023
Document Description
The project proposes to install and remove Class I and Class II temporary crossings (see Table 1 for encroachment details). Note that currently, R2 and R3 are existing culvert crossings which will be removed by October 15, 2023 under EPIMS 35070. The THP allows for timber operations to use these existing crossings in 2023
Contact Information
Name
Kim Backes
Agency Name
Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Name
James Strong
Agency Name
CALFIRE
Job Title
Review Team Chair
Contact Types
Lead/Public Agency
Phone
Email
Location
Counties
Humboldt
Regions
Northern California
Township
4N
Range
1E
Section
6
Base
Humboldt
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Humboldt
Final Environmental Document Available at
The final EIR, Negative Declaration or THP/NTMP that was prepared by the Lead Agency for this project is available to the General Public at the office location listed above for the Lead Agency. CDFW’s CEQA Findings are available at the Eureka CDFW office located at 619 Second Street, Eureka, California, 95501.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Timber Harvesting Plan)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.