Incline Road over Moss Canyon Bridge (#40C0064) Replacement Project
2 Documents in Project
Summary
SCH Number
2023060455
Lead Agency
Mariposa County
Document Title
Incline Road over Moss Canyon Bridge (#40C0064) Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
10/31/2023
Document Description
The Mariposa County Public Works Department proposes to replace the existing bridge (#40C0064) on Incline Road which is required to ensure current safety and design standards for bridges and roadways are maintained. Replacement of the existing bridge structure would occur with a single span, cast-in-place, post-tensioned concrete, slab bridge, approximately 55 feet long. The replacement structure will require falsework (temporary form work used to support the concrete until it develops strength) within locations of the creek channel. With a span length of 55 feet, it may be possible to keep falsework out of the creek by spanning the entire length with falsework stringers that are supported on the new abutment footings.
Contact Information
Name
Matiel Holloway, P.E.
Agency Name
Mariposa County Public Works Department
Job Title
Senior Civil Engineer
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project
Phone
Location
Cities
unincorporated Mariposa County
Counties
Mariposa
Regions
Countywide
Cross Streets
Incline Road & Foresta Road
Zip
95338
Total Acres
less than 2 acre
Parcel #
Stanislaus National Forest
State Highways
SR 140
Railways
n/a
Airports
n/a
Schools
n/a
Waterways
Moss Canyon Creek, Merced River
Township
3 S
Range
19 E
Section
13
Notice of Determination
Approving Agency
Mariposa County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On
County Clerk
Mariposa
Final Environmental Document Available at
www.mariposacounty.org/planning
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.