McBean Park Drive Bridge Replacement Project

2 Documents in Project

Summary

SCH Number
2023060349
Lead Agency
City of Lincoln
Document Title
McBean Park Drive Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
8/23/2023
Document Description
The City of Lincoln proposes to remove and replace the existing two-way, two-lane road McBean Park Bridge (Bridge No. 19C0254) at McBean Park Drive (formerly State Route 193) over the Auburn Ravine in Lincoln, California. The Project includes demolition of the existing 148-foot-long, 43-foot-wide bridge, construction of the replacement bridge to approximately 220 feet long by 68 feet wide with three 12-foot traffic lanes, two 8-foot shoulders, and two 6-foot sidewalks, relocation of utilities, temporary installation of water diversion structures, sediment removal and fill, and vegetation and tree removal. Street improvements connecting to McBean Park Bridge will also include portions of intersecting Ferrari Ranch Road and East Avenue.

Contact Information

Name
Edgar Garcia, PE
Agency Name
City of Lincoln
Job Title
City Engineer
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project

Location

Cities
Lincoln
Counties
Placer
Regions
Citywide
Cross Streets
McBean Park Drive Bridge over Auburn Ravine
Zip
95648
State Highways
SR 193
Railways
NA
Airports
NA
Schools
Guiding Stars Academy
Waterways
Auburn Ravine
Township
12N
Range
6E
Section
14, 15
Base
MDB&M

Notice of Determination

Approving Agency
City of Lincoln
Approving Agency Role
Lead Agency
Approved On
County Clerk
Placer
Final Environmental Document Available at
City Hall- 600 6th Street, Lincoln, CA

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print