Pool 33 Erosion Repairs
Summary
SCH Number
2023060010
Public Agency
California Department of Water Resources
(DWR)
Document Title
Pool 33 Erosion Repairs
Document Type
NOE - Notice of Exemption
Received
Posted
6/1/2023
Document Description
DWR SJFD staff is planning to fix several erosions along pool 33 of the State Water Project. To do this work, utility craft workers will fill and compact erosions from the road using a backhoe. A dump truck will be used to haul in fill material. A water truck may be used to aid in compaction and control dust. Staging will take place on paved or graveled surfaces. All work will take place within the DWR right-of-way. Work is estimated to take 1 to 2 days to complete. This work is necessary to protect the access roads from future rain events.
Contact Information
Name
Elizabeth Maldonado
Agency Name
Department of Water Resources, San Joaquin Field Division
Job Title
Environmental Scientist
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Bakersfield
Counties
Kern
Regions
Unincorporated
Other Location Info
Pool 33 of the State Water Project is located between check site 32 and 33. The midpoint is located at 35°04'31.5"N 119°14'01.8"W.
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15301 (b)
Reasons for Exemption
This project consists of maintenance activities that support the function of the California Aqueduct and water delivery within the State Water Project.
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.