Round Mountain 500 kV Dynamic Reactive Support Project

3 Documents in Project

Summary

SCH Number
2023050654
Lead Agency
California Public Utilities Commission (CPUC)
Document Title
Round Mountain 500 kV Dynamic Reactive Support Project
Document Type
NOD - Notice of Determination
Received
Posted
1/16/2024
Document Description
The Project would involve construction of the Fern Road Substation containing two static synchronous compensator (STATCOM) units (devices used to regulate voltages for transmission networks and assist in ensuring reliable operation of transmissions systems in proximity to a substation) and ancillary components adjacent and independently connected to Pacific Gas and Electric Company’s (PG&E) regional electric transmission system. The Project would support the regional transmission system by providing voltage support and grid stability, which would facilitate the reliable operation of the extra high voltage transmission system proximal to the PG&E Round Mountain and Table Mountain substations. The purpose of the Project is to provide dynamic reactive support at the PG&E Round Mountain Substation, a 500 kV level regional substation. Connection to the PG&E Round Mountain Substation would require PG&E to reconfigure approximately 1,000 feet of both the Round Mountain – Table Mountain #1 and #2 500 kV transmission lines for an overhead connection to the Fern Road Substation.

Contact Information

Name
Boris Sanchez
Agency Name
CPUC
Job Title
Public Utilities Regulatory Analyst III
Contact Types
Lead/Public Agency

Name
David Wilson
Agency Name
LS Power Grid CA, LLC
Job Title
Associate Vice President
Contact Types
Project Applicant

Location

Cities
Redding
Counties
Shasta
Regions
Countywide
Cross Streets
Fern Road
Zip
93505
Total Acres
40
Jobs
5
Parcel #
099-450-001-000
State Highways
N/A
Railways
N/A
Airports
N/A
Schools
N/A
Waterways
Old Cow Creek, Dry Clover Creek, Glendenning Creek
Township
32N
Range
1 W
Section
11
Base
Diablo

Notice of Determination

Approving Agency
Public Utilities, State of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.