Bohannon Dam Automation Project
5 Documents in Project
Summary
SCH Number
2023050632
Lead Agency
Reclamation District No. 1500
Document Title
Bohannon Dam Automation Project
Document Type
NOD - Notice of Determination
Received
Posted
7/28/2023
Document Description
The primary purpose of the Bohannon Dam Automation Project (Proposed Project) is to improve irrigation and flood control and enhance water sustainability in the Sacramento River Basin. On average of 20,000 acre-feet of water is lost from the Main Drain each year and installation of the Proposed Project would allow Reclamation District No. 1500 (RD 1500 or District) and Sutter Mutual Water Company (SMWC) to efficiently operate the irrigation system to reduce spills past Bohannon Dam.
A new Bohannon Dam structure would be fitted with six Rubicon SlipGates (or check structures). These check structures are 100% watertight when the SlipGates are in their closed position, allowing the check structure to pass zero flow downstream when there is no flow demand scheduled. The SlipGates have been selected to meet the required discharge capacity per SMWC guidelines for the head work check structure. In addition, one trash rack would be added to the Bohannon Dam structure.
The new Bohannon Dam or Water Control Facility would be managed by a central SCADA system, Rubicon SCADAConnect Live that precisely controls the flows in the Main Canal past the new Bohannon Dam. Rubicon’s cloud-based software would provide remote and precise management of water by writing gate position set points to each check structure to precisely match all water extractions including farmer water deliveries upstream and maintain required water level for operational efficiencies.
Contact Information
Name
Roger Cornwell
Agency Name
Reclamation District 1500
Job Title
General Manager
Contact Types
Lead/Public Agency
Phone
Location
Counties
Sutter
Regions
Countywide
Cross Streets
Reclamation Road and Varney Road
Zip
95676
Total Acres
1
State Highways
113
Airports
private airport
Notice of Determination
Approving Agency
Reclamation District 1500
Approving Agency Role
Lead Agency
Approved On
County Clerk
Sutter
Final Environmental Document Available at
15094 Cranmore Road Robbins, CA 95676
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Final Document(s) [Approved_Certified draft environmental documents]
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.