Ellwood Marine Terminal Demolition and Restoration Project

4 Documents in Project

Summary

SCH Number
2023050623
Lead Agency
University of California
Document Title
Ellwood Marine Terminal Demolition and Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
8/18/2023
Document Description
The Regents acquired the 174-acre UCSB North Campus in 1994. It was encumbered with a lease for the 17.75-acre Ellwood Marine Terminal (EMT) property, a petroleum storage and distribution facility in continuous use since 1929. The Project proposes to demolish and remove existing oil storage tanks and all other onshore structures associated with the former operation of the Ellwood Marine Terminal oil and gas facilities and remediate on-site soil contamination. The project includes restoring the project site to establish new wetlands and other native habitats and provide public access trails. The total restoration is approximately less than 20 acres as shown on the Restoration Plan in the Mitigated Negative Declaration. The Project includes removal of an approximately 1,890 foot offshore loading line and associated infrastructure. The offshore portion of the project is under California State Lands Commission jurisdiction.

Contact Information

Name
Ha Ly
Agency Name
University of California
Job Title
Associate Director, Physical and Environmental Planning
Contact Types
Lead/Public Agency

Location

Cities
Santa Barbara
Counties
Santa Barbara
Regions
Southern California
Other Location Info
UCSB North Campus

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print